Loading Events

« All Events

  • This event has passed.

Steam Outage – Athletic Energy Plant , UA Plumbing Maintenance

07/16/2018 - 07/18/2018

UA Plumbing will need to shutdown the steam system feeding Coleman Coliseum, the Indoor Practice Facility, the and Strength and Conditioning Facility in order to make repairs to the steam line.This shutdown is scheduled to start Monday night, July 16th, 2018 and last until sometime on Wednesday, July 18th, 2018.
This will only impact the reheating for the buildings listed above.
Athletics is aware that these buildings could possibly see slightly lower temps than normal.
UA HVAC will make adjustments to regulate temps.

Details

Start:
07/16/2018
End:
07/18/2018