Fire Sprinkler Outage Coordination – Mal Moore Athletic Facility Recruiting Room Upgrades, UA# 085-18-1485

06/22/2018 @ 5:00 AM - 7:00 AM CDT

Planning is complete for an upcoming fire sprinkler outage at the Mal Moore Athletic Facility in order to relocate existing fire sprinkler heads on the 1st floor, north end. This outage is scheduled for Friday, June 22nd, 2018 from 5:00 AM to 7:00 AM.
This will not be an entire building outage.  It should only impact a portion of the building on the 1st floor, north end.
Notes:
• UA Plumbing shop will valve off the system and refill once work is complete
• Contractor to drain the system and make the tie-in
• EHS to bypass the flow switches prior to refilling the system
• Fire watch not required due to duration being less than 4 hours

Details

Date:
06/22/2018
Time:
5:00 AM - 7:00 AM CDT