This will impact all mechanical and electrical systems of the building.
Notes:
• Building has a back-up emergency generator
• Fire alarm system is on the emergency generator and will remain operational
• Fire sprinkler system for the new portion is on city water pressure and will remain operational
• Fire sprinkler system in basement and 1st floor of old portion is operated by a fire pump. This fire pump is not on the emergency generator. Building should not be occupied during this time so a fire watch will not be required
• Sump pump in elevator pit is on the emergency power system
• UA HVAC to shutoff all mechanical equipment and restart once work is complete
• UA Elevator to shutoff and secure all elevators
• Building reps to verify if dehumidifiers for the organ in concert hall need temp. power