Notes:• Entire building will be without A/C
• Building heat will not be impacted
• UA HVAC to setup temporary “water cooled” A/C units in rooms 211-213 (computers/office), 228, 245-246 (fish spaces)
• UA OIT to verify if temp. A/C is needed for data closets. UA HVAC can open doors to create airflow