Loading Events

« All Events

  • This event has passed.

Electrical Shutdown – Riverside East and North Residential , UA Electrical Maintenance

07/09/2018 @ 9:00 AM - 2:00 PM CDT

Planning is complete for an upcoming electrical shutdown of Riverside East and North Residential in order to perform preventive maintenance.This shutdown is scheduled for Monday, July 9th, 2018 from 9:0O AM to 2:00 PM.
This will impact all electrical and mechanical systems.
Notes:
• Riverside E and N does not have back-up emergency generator
• Fire alarm system is on battery backup and will remain operational
• Fire sprinkler system for both buildings is operated from the Presidential Village 1 fire pump and will remain operational
• UA HVAC to shutoff all mechanical equipment and verify startup
• UA Elevator to shutdown and secure the elevators
• There are no summer camps in Riverside E & N on this day
• Ricky Luker to submit work orders to shops
Please direct any questions regarding this shutdown to Ricky Luker. (205) 361-1664

Details

Date:
07/09/2018
Time:
9:00 AM - 2:00 PM CDT