Loading Events

« All Events

  • This event has passed.

Electrical Shutdown – University Services Campus

04/14/2018 @ 7:00 AM - 04/15/2018 @ 7:00 PM CDT

Planning is complete for an upcoming electrical shutdown of the University Services Campus.
• Impacted buildings include:
o All buildings north of Ruby Tyler Pkwy
o F.C. White Food Service building and Wallace Educational building which are on the south side of Ruby Tyler Pkwy
o The New Kitchen for Bryce and the Main Bryce Hospital will not be impacted
 
This electrical shutdown is scheduled to start on Saturday, April 14th, 2018 at 7:00 AM and will end on Sunday, April 15th, 2018 at 7:00 PM.
 
Notes for buildings currently in-use:

• Business Activities Center
o Has back-up emergency generator
o Fire alarm system on generator and battery back-up and will remain operational
o Building is sprinkled and on city water pressure
o Sewer pump for the west bathrooms is not on the emergency back-up system.  These bathrooms do not need to be used
 
• Procurement Services
o Has back-up emergency generator
o Fire alarm system on generator and battery back-up and will remain operational
o Building is sprinkled and on city water pressure
o No other concerns
 
• Ruby Tyler Hall
o Not on emergency back-up power
o FA system on 24 hour battery back-up and will remain operational until batteries are depleted
o Building is sprinkled and on city water pressure
o No other concerns
 
• New Automotive Services
o Has back-up emergency generator
o Fire alarm system on generator and battery back-up (Kelton K./GC to connect FA panel to temp. generator on Cottage 8 in order to keep Automotive Services in the network loop. Coordinate with EHS)
o Building is sprinkled and on city water pressure
o No other concerns
 
• Bus Maintenance Garage
o Has back-up emergency generator
o Fire alarm system on generator and battery back-up and will remain operational
o Building is sprinkled and on city water pressure
o No other concerns
 
• Bus Fueling Station
o Has back-up emergency generator
 
• Cottage 8 (Equestrian)
o Not on emergency back-up power
o FA system on 24 hour battery back-up (This FA panel will have a temp. generator connected will remain operational)
o Building is sprinkled and on city water pressure
o No other concerns
 
• Cottage 9 (Const. Admin.)
o Not on emergency back-up power
o FA system on 24 hour battery back-up and will remain operational until batteries are depleted
o Building is sprinkled and on city water pressure
o No other concerns
 

Details

Start:
04/14/2018 @ 7:00 AM CDT
End:
04/15/2018 @ 7:00 PM CDT