Loading Events

« All Events

  • This event has passed.

Electrical Shutdown – University Services Campus Medium Voltage Upgrades , UA# 000-15-377

07/28/2018 @ 7:00 AM - 12:00 PM CDT

Planning is complete for an upcoming electrical shutdown of the University Services Campus.• Impacted buildings include:
o All buildings north of Ruby Tyler Pkwy
o F.C. White Food Service building and Wallace Educational building which are on the south side of Ruby Tyler Pkwy
o The New Kitchen for Bryce and the Main Bryce Hospital will not be impacted
This electrical shutdown is scheduled for Saturday, July 28th, 2018 from 7:00 AM to 12:00 PM.
Notes for buildings currently in-use:
• Business Activities Center
o Has back-up emergency generator
o Fire alarm system on generator and battery back-up and will remain operational
o Building is sprinkled and on city water pressure
o Sewer pump for the west bathrooms is not on the emergency back-up system.  These bathrooms do not need to be used
o No other concerns
• Procurement Services
o Has back-up emergency generator
o Fire alarm system on generator and battery back-up and will remain operational
o Building is sprinkled and on city water pressure
o No other concerns
• Ruby Tyler Hall
o Not on emergency back-up power
o FA system on 24 hour battery back-up and will remain operational
o Building is sprinkled and on city water pressure
o No other concerns
• New Automotive Services
o Has back-up emergency generator
o Fire alarm system on generator and battery back-up
o Building is sprinkled and on city water pressure
o No other concerns
• Bus Maintenance Garage
o Has back-up emergency generator
o Fire alarm system on generator and battery back-up and will remain operational
o Building is sprinkled and on city water pressure
o No other concerns
• Bus Fueling Station
o Has back-up emergency generator
• Cottage 8 (Equestrian)
o Not on emergency back-up power
o FA system on 24 hour battery back-up
o Building is sprinkled and on city water pressure
o No other concerns
• Cottage 9 (Const. Admin.)
o Not on emergency back-up power
o FA system on 24 hour battery back-up and will remain operational
o Building is sprinkled and on city water pressure
o No other concerns
General notes:
• UA Facilities to verify start-up of equipment once power is restored
• All computers will need to be powered down prior to start of shutdown
• Alison Ferrer to submit work orders to UA HVAC, UA Elect, UA Plumb

Kelton Kite to contact personnel from each shop when power is being restored:
UA Plumb: 205-561-4148
UA HVAC: 205-361-2124
UA Elect: 205-210-1738

Details

Date:
07/28/2018
Time:
7:00 AM - 12:00 PM CDT