BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Construction Public Information - ECPv6.5.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Construction Public Information
X-ORIGINAL-URL:https://constructionpublicinfo.ua.edu
X-WR-CALDESC:Events for Construction Public Information
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20180311T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20181104T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20180226
DTEND;VALUE=DATE:20180319
DTSTAMP:20260409T050150
CREATED:20181008T201609Z
LAST-MODIFIED:20181008T201609Z
UID:800-1519603200-1521417599@constructionpublicinfo.ua.edu
SUMMARY:Thermal Hot Water Outage - Smith Hall
DESCRIPTION:Notes:Hot Water\n• Building should only see minimal impact due to HW outage\n• This will only impact the reheating system of the building\n• If outside temps were to drop low enough\, the heating for this building can be supplied by the existing campus steam system
URL:https://constructionpublicinfo.ua.edu/bid/thermal-hot-water-outage-smith-hall/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20180310
DTEND;VALUE=DATE:20180319
DTSTAMP:20260409T050150
CREATED:20181008T201608Z
LAST-MODIFIED:20181008T201608Z
UID:799-1520640000-1521417599@constructionpublicinfo.ua.edu
SUMMARY:Thermal Cold Water Outage - Smith Hall
DESCRIPTION:Notes:Chilled Water\n• This will impact A/C for the entire building during the week of spring break\n• Building impact would depend on outside temps during spring break\n• UA OIT to verify if temp. A/C will be needed for the data closet(s)
URL:https://constructionpublicinfo.ua.edu/bid/thermal-cold-water-outage-smith-hall/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180312T060000
DTEND;TZID=America/Chicago:20180316T180000
DTSTAMP:20260409T050150
CREATED:20181008T201607Z
LAST-MODIFIED:20181008T201607Z
UID:797-1520834400-1521223200@constructionpublicinfo.ua.edu
SUMMARY:Thermal "Chilled Water" Outage - NE Medical Building
DESCRIPTION:Notes:• Entire building will be without A/C\n• Building heat will not be impacted\n• UA OIT to verify if temp. A/C is needed for data closets.  UA HVAC can open doors to create airflow
URL:https://constructionpublicinfo.ua.edu/bid/thermal-chilled-water-outage-ne-medical-building/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180315T090000
DTEND;TZID=America/Chicago:20180323T113000
DTSTAMP:20260409T050150
CREATED:20181008T201604Z
LAST-MODIFIED:20181008T201604Z
UID:792-1521104400-1521804600@constructionpublicinfo.ua.edu
SUMMARY:Gas Outage - Bryant Conference Center and Martha Parham East
DESCRIPTION:Bryant Conference Center is scheduled to be without gas on Thursday\, March 15th\, 2018 from 9:00 AM to 10:00 AM. \nMartha Parham East is scheduled to be without gas on Thursday\, March 15th\, 2018 from 10:00 AM to 11:30 AM.\n \nNotes:\n• UA HVAC will shutoff the boiler to BCC on 3/15 at 8:30 AM.  BCC will be without heating for 1 hour\n• Martha Parham East should not see an impact
URL:https://constructionpublicinfo.ua.edu/bid/gas-outage-bryant-conference-center-and-martha-parham-east/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180315T180000
DTEND;TZID=America/Chicago:20180316T020000
DTSTAMP:20260409T050150
CREATED:20181008T201604Z
LAST-MODIFIED:20181008T201604Z
UID:791-1521136800-1521165600@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - AIME Building
DESCRIPTION:Notes:• Building has back-up emergency generator\n• Fire alarm system is on the emergency power system and will remain operational\n• Fire sprinkler system is operated by city water pressure and will remain operational\n• UA HVAC to shutoff all mechanical equipment and restart once power is restored\n• UA HVAC to check that all fume hoods restart once power is restored\n• UA Elev. to shutoff and secure the 2 elevators on 3/15 at 4PM and restart on 3/16 by 6AM\n• UA OIT to verify if equipment is connected to emergency power system.  IT equipment may need to remain operational due to tests performed by Hunt Oil employees.  Please confirm this with Renae Sullivan (Building Rep)\n• Exterior lighting will be impacted.  UAPD and Security Resources may need to provide extra patrol due to shutdown taking place during nighttime
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-aime-building/
LOCATION:AL
END:VEVENT
END:VCALENDAR