BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Construction Public Information - ECPv6.5.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Construction Public Information
X-ORIGINAL-URL:https://constructionpublicinfo.ua.edu
X-WR-CALDESC:Events for Construction Public Information
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20180311T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20181104T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180424T170000
DTEND;TZID=America/Chicago:20180521T070000
DTSTAMP:20260408T075808
CREATED:20181008T201557Z
LAST-MODIFIED:20181008T201557Z
UID:782-1524589200-1526886000@constructionpublicinfo.ua.edu
SUMMARY:Water Outage - Capstone Parking Deck
DESCRIPTION:Planning is complete for an upcoming water outage in order to lower an existing 30” city main so that future storm drainage can be installed for the subject project. \nThis water outage is scheduled to start on May 21st\, 2018 at 7:00 AM and end on May 24th\, 2018 at 5:00 PM.\n \nThis will only impact water to the Sewell Thomas Stadium irrigation system and the STS Utility Shed.\n \nPlease note: This work will take place in the intersection of Bryant Dr./2nd Ave.\, however\, Bryant Dr. east/west bound traffic lanes will remain open through the intersection.  2nd Ave. between Bryant Dr. and University Blvd. will be closed.\n \nNotes:\n• City of Tuscaloosa responsible for shutting water off\n• City of Tuscaloosa responsible for flushing lines prior to turning water back on\n• UA Facilities to perform walk-thru of utility shed once water is restored
URL:https://constructionpublicinfo.ua.edu/bid/water-outage-capstone-parking-deck/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180517T150000
DTEND;TZID=America/Chicago:20180517T160000
DTSTAMP:20260408T075808
CREATED:20181008T204524Z
LAST-MODIFIED:20181015T160025Z
UID:905-1526569200-1526572800@constructionpublicinfo.ua.edu
SUMMARY:Southwest Campus Utilities & Infrastructure - Phase II
DESCRIPTION:UTL-17-1016B
URL:https://constructionpublicinfo.ua.edu/bid/southwest-campus-utilities-infrastructure-phase-ii-2/
LOCATION:AL
CATEGORIES:Pre-Bid Conference
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180517T180000
DTEND;TZID=America/Chicago:20180517T220000
DTSTAMP:20260408T075808
CREATED:20181008T201556Z
LAST-MODIFIED:20181008T201556Z
UID:779-1526580000-1526594400@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Lakeside Dining Hall\, UA Electrical Maintenance
DESCRIPTION:An electrical shutdown at Lakeside Dining Hall has been scheduled to perform electrical maintenance.  \nThis shutdown is scheduled for tonight\, Thursday\, May 17th\, 2018 from 6:00 PM to 10:00 PM.\n \nNotes:\n• The building is currently closed for the dining hall renovation project\n• Dunkin Donuts is closed for the summer so their operations won’t be impacted.  All cold storage items has been moved elsewhere so freezers won’t be an issue\n• UA Elevator has shutoff and secured the elevators\n• Ricky Luker to submit work orders to shops that request one
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-lakeside-dining-hall-ua-electrical-maintenance/
LOCATION:AL
END:VEVENT
END:VCALENDAR