BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Construction Public Information - ECPv6.5.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Construction Public Information
X-ORIGINAL-URL:https://constructionpublicinfo.ua.edu
X-WR-CALDESC:Events for Construction Public Information
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20180311T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20181104T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180525T060000
DTEND;TZID=America/Chicago:20180525T120000
DTSTAMP:20260408T154314
CREATED:20181008T201555Z
LAST-MODIFIED:20181008T201555Z
UID:778-1527228000-1527249600@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Bryce Lawn Apartments\, UA Electrical Maintenance
DESCRIPTION:An electrical shutdown is scheduled for the Bryce Lawn Apartments in order to perform preventive maintenance.This shutdown is scheduled for tomorrow morning\, May 25th\, 2018 from 6:00 AM to 12:00 PM.\nNotes:\n• UA Facilities to verify all equipment is operational once power is restored\n• UA Housing is aware and prepared for shutdown\n• Ricky Luker to submit work orders to shops upon request
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-bryce-lawn-apartments-ua-electrical-maintenance/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180525T080000
DTEND;TZID=America/Chicago:20180525T100000
DTSTAMP:20260408T154314
CREATED:20181008T201554Z
LAST-MODIFIED:20181008T201554Z
UID:777-1527235200-1527242400@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Mal Moore Athletic Facility Dining Addition\, UA# 085-16-953
DESCRIPTION:The generator for the Mal Moore Dining Addition needs to be tested again.This is scheduled for tomorrow morning\, May 25th\, 2018 from 8:00 AM to 10:00 AM.\nNotes:\n• The power to Mal Moore Athletic Facility will be off momentarily until the new generator responds with emergency power.  Once on emergency power\, building systems should operate as normal\n• UA Facilities to verify all equipment comes on during shutdown and afterwards once normal power is restored\n• UA Facilities and Athletics are both aware\n• Alison F. to submit work orders to UA HVAC\, UA Electrical
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-mal-moore-athletic-facility-dining-addition-ua-085-16-953/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180525T110000
DTEND;TZID=America/Chicago:20180525T120000
DTSTAMP:20260408T154314
CREATED:20181008T204815Z
LAST-MODIFIED:20181015T155634Z
UID:965-1527246000-1527249600@constructionpublicinfo.ua.edu
SUMMARY:Public Opinion Lab AV Equipment (Title 39)
DESCRIPTION:N/A
URL:https://constructionpublicinfo.ua.edu/bid/public-opinion-lab-av-equipment-title-39/
LOCATION:AL
CATEGORIES:Bid Openings
END:VEVENT
END:VCALENDAR