BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Construction Public Information - ECPv6.5.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Construction Public Information
X-ORIGINAL-URL:https://constructionpublicinfo.ua.edu
X-WR-CALDESC:Events for Construction Public Information
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20180311T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20181104T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180602T060000
DTEND;TZID=America/Chicago:20180605T160000
DTSTAMP:20260407T070908
CREATED:20181008T201554Z
LAST-MODIFIED:20181008T201554Z
UID:776-1527919200-1528214400@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Bryant Denny Stadium \, UA Electrical Maintenance
DESCRIPTION:This will impact power to the entire stadium.**The Digital Media Center will be brought back online by the emergency power system throughout the duration of the shutdown.  However\, the Digital Media Center may encounter a brief power outage at the start and end times of the shutdown.  If this is an issue\, the Digital Media Center representative will need to contact Ricky Luker with UA Electrical at 348-3961.\n** Daniel Black to verify if all broadcast equipment is on UPS.\nNotes:\n• This will impact all electrical and mechanical systems\n• BDS is on 7 back-up emergency generators\n• The Emergency Operations Center will be impacted (EOC is on the back-up emergency system)\n• Fire Alarm system is on back-up emergency system\n• BDS has (2) fire pumps\n• Chillers for the north zone and south zone will be impacted\n• West elevators will be out of operation. North\, south and east elevators are on the back-up emergency system (Digital Media Center to use Northeast elevators)\n• Camera systems/monitoring equipment will be ok per Michael Kelley (note from prior shutdown)\n• Access control will not be operational.  Not on emergency system\n• The gate control for Zoe’s on south end will be impacted (Shawn T. to raise for the weekend)\n• The OIT data closet by the home team locker room is not on the emergency system. No other buildings should be impacted (note from prior shutdown)\nAction Items:\n• 2 fire pumps impacted – South and East Sides – East side fire pump is on back-up emergency system.  UA Plumbing to verify if the south side fire pump is on the emergency system.  If not\, UA Electrical to coordinate with Security Resources about performing fire watch\n• UA Plumbing shop to verify if plumbing equipment (booster pumps\, sump and grinder pumps\, water heaters\, ect.) are on the emergency system.  If not\, is generator needed? (ask Terry McMillan with UA Electrical)\n• UA HVAC to shutdown all mechanical equipment and start-up once power is restored\n• UA Elevator Maint. to shutoff and secure all elevators that will not remain operational.  Verify start-up once power is restored\n• UA Electrical to notify Stephen Lake 30 min prior to restoring normal power in order to test transfer switch functionality for east elevators\n• Shawn Templeton to coordinate with Zoe’s Kitchen\n• Due to security risk\, building signage will not be posted\n• Ricky Luker to submit work orders to shops for building support upon request
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-bryant-denny-stadium-ua-electrical-maintenance-2/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180605T080000
DTEND;TZID=America/Chicago:20180606T050000
DTSTAMP:20260407T070908
CREATED:20181008T201553Z
LAST-MODIFIED:20181008T201553Z
UID:775-1528185600-1528261200@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Bicycle Shop Operation Center Demolition \, UA# 424-17-1246
DESCRIPTION:Planning is complete for an upcoming electrical shutdown in order to remove power to the Bicycle Shop Operation Center to allow for demolition.This shutdown is scheduled for Wednesday\, June 6th\, 2018 from 5:00 AM to 8:00 AM\, but could end sooner.\nThis will impact power to EHS\, Student Media and the Theater and Dance buildings.\nNotes:\n• UA Electrical is aware and will perform the disconnection\n• Student Media is on back-up emergency generator and all equipment will stay operational\n• Student Media fire alarm system is on the emergency generator and will remain operational\n• EHS & Theater and Dance do not have a back-up emergency generator but fire alarm systems are on battery back-up and will remain operational\n• UA HVAC to verify all A/C equipment is operational once power is restored to EHS\, Student Media\, & Theater and Dance
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-bicycle-shop-operation-center-demolition-ua-424-17-1246/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180605T100000
DTEND;TZID=America/Chicago:20180605T110000
DTSTAMP:20260407T070908
CREATED:20181008T204522Z
LAST-MODIFIED:20181015T160025Z
UID:901-1528192800-1528196400@constructionpublicinfo.ua.edu
SUMMARY:Ruby Tyler Renovation for Fleet Services
DESCRIPTION:1020-18-1659
URL:https://constructionpublicinfo.ua.edu/bid/ruby-tyler-renovation-for-fleet-services-2/
LOCATION:AL
CATEGORIES:Pre-Bid Conference
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180605T150000
DTEND;TZID=America/Chicago:20180605T160000
DTSTAMP:20260407T070908
CREATED:20181008T204814Z
LAST-MODIFIED:20181015T155633Z
UID:963-1528210800-1528214400@constructionpublicinfo.ua.edu
SUMMARY:Bidgood Behavioral Lab
DESCRIPTION:031-18-1504
URL:https://constructionpublicinfo.ua.edu/bid/bidgood-behavioral-lab-3/
LOCATION:AL
CATEGORIES:Bid Openings
END:VEVENT
END:VCALENDAR