BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Construction Public Information - ECPv6.5.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Construction Public Information
X-ORIGINAL-URL:https://constructionpublicinfo.ua.edu
X-WR-CALDESC:Events for Construction Public Information
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20180311T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20181104T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180621T070000
DTEND;TZID=America/Chicago:20180621T120000
DTSTAMP:20260407T140834
CREATED:20181008T201550Z
LAST-MODIFIED:20181008T201550Z
UID:771-1529564400-1529582400@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - University Hall Renovation \, UA# 420-17-1006
DESCRIPTION:Planning is complete for an upcoming electrical shutdown for the University Hall Renovation project.This shutdown is scheduled for Saturday\, July 21st\, 2018 from 7:00 AM to 12:00 PM.\nThis will impact normal power to Capital Hall\, Bryant-Jordan Hall\, the Bryce Main and old Superintendents building.\nNotes:\n• UA Electrical to coordinate “hot ties” with Alabama Power.  This allows for isolation of only the buildings noted above.  The Harper Center on Bryce campus will not be impacted\n• Capital Hall\no Has back-up emergency generator\no Fire alarm system is on emergency generator and will remain operational\no Fire pump is on emergency generator so the fire sprinkler system will remain operational\no UA HVAC to shutoff and restart equipment\no UA Plumbing – No items of concern noted\no UA Elevator to shutdown and secure the elevators\no Access control (card access) on west side of building will not be operational\no All computers need to be powered down prior to electrical shutdown\n• Bryant-Jordan Hall\no Fire Alarm system is on battery back-up and will remain operational\no UA HVAC to shutoff and restart equipment\no UA Plumbing – No items of concern noted\no All computers need to be powered down prior to electrical shutdown\n• UA Facilities to perform walk-thru of both buildings once power is restored
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-university-hall-renovation-ua-420-17-1006/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180621T100000
DTEND;TZID=America/Chicago:20180621T110000
DTSTAMP:20260407T140834
CREATED:20181008T204520Z
LAST-MODIFIED:20181015T160024Z
UID:899-1529575200-1529578800@constructionpublicinfo.ua.edu
SUMMARY:Project Delivery Services Renovation Cottage #1
DESCRIPTION:1024-18-1349
URL:https://constructionpublicinfo.ua.edu/bid/project-delivery-services-renovation-cottage-1-3/