BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Construction Public Information - ECPv6.5.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Construction Public Information
X-ORIGINAL-URL:https://constructionpublicinfo.ua.edu
X-WR-CALDESC:Events for Construction Public Information
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20180311T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20181104T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180622T050000
DTEND;TZID=America/Chicago:20180622T070000
DTSTAMP:20260407T031538
CREATED:20181008T201549Z
LAST-MODIFIED:20181008T201549Z
UID:770-1529643600-1529650800@constructionpublicinfo.ua.edu
SUMMARY:Fire Sprinkler Outage Coordination - Mal Moore Athletic Facility Recruiting Room Upgrades\, UA# 085-18-1485
DESCRIPTION:Planning is complete for an upcoming fire sprinkler outage at the Mal Moore Athletic Facility in order to relocate existing fire sprinkler heads on the 1st floor\, north end. This outage is scheduled for Friday\, June 22nd\, 2018 from 5:00 AM to 7:00 AM.\nThis will not be an entire building outage.  It should only impact a portion of the building on the 1st floor\, north end.\nNotes:\n• UA Plumbing shop will valve off the system and refill once work is complete\n• Contractor to drain the system and make the tie-in\n• EHS to bypass the flow switches prior to refilling the system\n• Fire watch not required due to duration being less than 4 hours
URL:https://constructionpublicinfo.ua.edu/bid/fire-sprinkler-outage-coordination-mal-moore-athletic-facility-recruiting-room-upgrades-ua-085-18-1485/
LOCATION:AL
END:VEVENT