BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Construction Public Information - ECPv6.5.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Construction Public Information
X-ORIGINAL-URL:https://constructionpublicinfo.ua.edu
X-WR-CALDESC:Events for Construction Public Information
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20180311T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20181104T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180709T090000
DTEND;TZID=America/Chicago:20180709T140000
DTSTAMP:20260411T053826
CREATED:20181008T201542Z
LAST-MODIFIED:20181008T201542Z
UID:764-1531126800-1531144800@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Riverside East and North Residential \, UA Electrical Maintenance
DESCRIPTION:Planning is complete for an upcoming electrical shutdown of Riverside East and North Residential in order to perform preventive maintenance.This shutdown is scheduled for Monday\, July 9th\, 2018 from 9:0O AM to 2:00 PM.\nThis will impact all electrical and mechanical systems.\nNotes:\n• Riverside E and N does not have back-up emergency generator\n• Fire alarm system is on battery backup and will remain operational\n• Fire sprinkler system for both buildings is operated from the Presidential Village 1 fire pump and will remain operational\n• UA HVAC to shutoff all mechanical equipment and verify startup\n• UA Elevator to shutdown and secure the elevators\n• There are no summer camps in Riverside E & N on this day\n• Ricky Luker to submit work orders to shops\nPlease direct any questions regarding this shutdown to Ricky Luker. (205) 361-1664
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-riverside-east-and-north-residential-ua-electrical-maintenance/
LOCATION:AL
END:VEVENT
END:VCALENDAR