BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Construction Public Information - ECPv6.5.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Construction Public Information
X-ORIGINAL-URL:https://constructionpublicinfo.ua.edu
X-WR-CALDESC:Events for Construction Public Information
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20180311T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20181104T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180808T230000
DTEND;TZID=America/Chicago:20180809T070000
DTSTAMP:20260406T133334
CREATED:20181008T201531Z
LAST-MODIFIED:20181008T201531Z
UID:752-1533769200-1533798000@constructionpublicinfo.ua.edu
SUMMARY:Gas Outage - Shelby Hall and Graves Hall \, UA Plumbing Maintenance
DESCRIPTION:A short\, 30 minute gas outage has been planned for Shelby Hall and Graves Hall in order to perform maintenance to the gas meter.This work is scheduled for some time between 11:00 PM on Wednesday\, August 8th\, 2018 and 7:00 AM on Thursday\, August 9th\, 2018.\nDue to the short duration\, the buildings shouldn’t see much of an impact. \nImpacts include:\n• Gas to labs in Shelby Hall\n• Domestic hot water to both buildings\n• Building reheat in Graves Hall\nUA Plumbing and UA HVAC to verify that all equipment is operational once work is complete.
URL:https://constructionpublicinfo.ua.edu/bid/gas-outage-shelby-hall-and-graves-hall-ua-plumbing-maintenance/
LOCATION:AL
END:VEVENT
END:VCALENDAR