BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Construction Public Information - ECPv6.5.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Construction Public Information
X-ORIGINAL-URL:https://constructionpublicinfo.ua.edu
X-WR-CALDESC:Events for Construction Public Information
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20180311T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20181104T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180912T080000
DTEND;TZID=America/Chicago:20180912T150000
DTSTAMP:20260406T080447
CREATED:20181008T201513Z
LAST-MODIFIED:20181008T201513Z
UID:746-1536739200-1536764400@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown Coordination - Tutwiler Parking Deck (UA# 782-16-951) \, SW Campus Utilities and Infrastructure (UA# UTL-17-1016)
DESCRIPTION:An electrical shutdown has been planned for the Tutwiler Parking Deck in order for Alabama Power Co. to convert their overhead lines to underground along the north side of 12th St.This work is scheduled to take place on Wednesday\, September 12th\, 2018 from 8:00 AM to 3:00 PM.  The Tutwiler Parking Deck will be without normal power for approx. 3 hours within this timeframe.\nIf weather does not permit for 9/12\, then this work will take place on 9/13 during the same time.\nNotes:\n• The Tutwiler Parking Deck has a back-up emergency generator and will remain operational\n• UA Transportation Services to open gate arms prior to shutdown if needed
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-coordination-tutwiler-parking-deck-ua-782-16-951-sw-campus-utilities-and-infrastructure-ua-utl-17-1016/
LOCATION:AL