The southbound lane of McCorvey Dr. will be closed from Hackberry Ln. to 2nd St. for approx. 5 hours on Tuesday, April 24th, 2018 in order to setup a concrete truck for an overnight slab pour.This closure will last from 1:00 AM to 6:00 AM (4/24/18). Please see attached map showing the portion of McCorvey […]
158-18-1578
942-17-1161
1024-18-1349
Planning is complete for an upcoming water outage in order to lower an existing 30” city main so that future storm drainage can be installed for the subject project. This water outage is scheduled to start on May 21st, 2018 at 7:00 AM and end on May 24th, 2018 at 5:00 PM. This will […]
375-18-1491, 376-18-1490 & 377-18-1489
TRN-18-1584
158-18-1578
TRN-18-1536
1024-18-1349
420-17-1006C
031-18-1504
TRN-18-1536
Planning is complete for an upcoming electrical shutdown of the Mal Moore Athletic Facility in order to test the new generator installed under the dining addition project. This shutdown is scheduled for Friday, May 11th, 2018 from 2:00 PM to 5:00 PM. Notes: • The power to Mal Moore Athletic Facility will be off momentarily until […]
Planning is complete for a water outage at the Mal Moore Athletic Facility in order to install isolation valves to allow for work associated with the subject project. This outage is scheduled for today, Thursday, May 10th, 2018 from 6:00 PM to 9:00 PM. Notes: • Shawn Templeton is aware • This will impact domestic water only […]
031-18-1504
TRN-18-1568
1017-17-1073
An electrical shutdown at Lakeside Dining Hall has been scheduled to perform electrical maintenance. This shutdown is scheduled for tonight, Thursday, May 17th, 2018 from 6:00 PM to 10:00 PM. Notes: • The building is currently closed for the dining hall renovation project • Dunkin Donuts is closed for the summer so their operations won’t […]
301-17-1275
1020-18-1659
1017-17-1073
TRN-18-1568
An electrical shutdown is scheduled for the Bryce Lawn Apartments in order to perform preventive maintenance.This shutdown is scheduled for tomorrow morning, May 25th, 2018 from 6:00 AM to 12:00 PM. Notes: • UA Facilities to verify all equipment is operational once power is restored • UA Housing is aware and prepared for shutdown • Ricky Luker to […]
The generator for the Mal Moore Dining Addition needs to be tested again.This is scheduled for tomorrow morning, May 25th, 2018 from 8:00 AM to 10:00 AM. Notes: • The power to Mal Moore Athletic Facility will be off momentarily until the new generator responds with emergency power. Once on emergency power, building systems should operate […]
TRN-18-1536
This will impact power to the entire stadium.**The Digital Media Center will be brought back online by the emergency power system throughout the duration of the shutdown. However, the Digital Media Center may encounter a brief power outage at the start and end times of the shutdown. If this is an issue, the Digital Media […]
Planning is complete for an upcoming electrical shutdown in order to remove power to the Bicycle Shop Operation Center to allow for demolition.This shutdown is scheduled for Wednesday, June 6th, 2018 from 5:00 AM to 8:00 AM, but could end sooner. This will impact power to EHS, Student Media and the Theater and Dance buildings. […]
1020-18-1659
031-18-1504
TRN-18-1568
415-14-172
Planning is complete for an upcoming electrical shutdown of the University Services Campus.• Impacted buildings include: o All buildings north of Ruby Tyler Pkwy o F.C. White Food Service building and Wallace Educational building which are on the south side of Ruby Tyler Pkwy o The New Kitchen for Bryce and the Main Bryce Hospital will not be impacted […]
301-17-1275
1024-18-1349
Planning is complete for an upcoming gas outage in order to relocate an existing gas line that is in conflict the installation of a storm drain for the captioned project.This outage is scheduled for Thursday, June 14th, 2018 from 7:00 AM to 5:00 PM. This will impact gas service to Moody Music Building, Bryant Conference […]
This shutdown has been rescheduled for Thursday, June 14th, 2018 from 1:00 PM to 5:00 PM.This will shutoff power to Bryant-Jordan Hall, Bryce Superintendents Building and will impact construction power to the main Bryce Hospital. Notes: • Fire Alarm system for Bryant-Jordan Hall is on battery back-up and will remain operational • UA Facilities to perform walk-thru […]
1020-18-1659
Planning is complete for an upcoming electrical shutdown for the University Hall Renovation project.This shutdown is scheduled for Saturday, July 21st, 2018 from 7:00 AM to 12:00 PM. This will impact normal power to Capital Hall, Bryant-Jordan Hall, the Bryce Main and old Superintendents building. Notes: • UA Electrical to coordinate “hot ties” with Alabama Power. […]