BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Construction Public Information - ECPv6.5.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Construction Public Information
X-ORIGINAL-URL:https://constructionpublicinfo.ua.edu
X-WR-CALDESC:Events for Construction Public Information
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20180311T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20181104T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180602T060000
DTEND;TZID=America/Chicago:20180605T160000
DTSTAMP:20260406T215802
CREATED:20181008T201554Z
LAST-MODIFIED:20181008T201554Z
UID:776-1527919200-1528214400@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Bryant Denny Stadium \, UA Electrical Maintenance
DESCRIPTION:This will impact power to the entire stadium.**The Digital Media Center will be brought back online by the emergency power system throughout the duration of the shutdown.  However\, the Digital Media Center may encounter a brief power outage at the start and end times of the shutdown.  If this is an issue\, the Digital Media Center representative will need to contact Ricky Luker with UA Electrical at 348-3961.\n** Daniel Black to verify if all broadcast equipment is on UPS.\nNotes:\n• This will impact all electrical and mechanical systems\n• BDS is on 7 back-up emergency generators\n• The Emergency Operations Center will be impacted (EOC is on the back-up emergency system)\n• Fire Alarm system is on back-up emergency system\n• BDS has (2) fire pumps\n• Chillers for the north zone and south zone will be impacted\n• West elevators will be out of operation. North\, south and east elevators are on the back-up emergency system (Digital Media Center to use Northeast elevators)\n• Camera systems/monitoring equipment will be ok per Michael Kelley (note from prior shutdown)\n• Access control will not be operational.  Not on emergency system\n• The gate control for Zoe’s on south end will be impacted (Shawn T. to raise for the weekend)\n• The OIT data closet by the home team locker room is not on the emergency system. No other buildings should be impacted (note from prior shutdown)\nAction Items:\n• 2 fire pumps impacted – South and East Sides – East side fire pump is on back-up emergency system.  UA Plumbing to verify if the south side fire pump is on the emergency system.  If not\, UA Electrical to coordinate with Security Resources about performing fire watch\n• UA Plumbing shop to verify if plumbing equipment (booster pumps\, sump and grinder pumps\, water heaters\, ect.) are on the emergency system.  If not\, is generator needed? (ask Terry McMillan with UA Electrical)\n• UA HVAC to shutdown all mechanical equipment and start-up once power is restored\n• UA Elevator Maint. to shutoff and secure all elevators that will not remain operational.  Verify start-up once power is restored\n• UA Electrical to notify Stephen Lake 30 min prior to restoring normal power in order to test transfer switch functionality for east elevators\n• Shawn Templeton to coordinate with Zoe’s Kitchen\n• Due to security risk\, building signage will not be posted\n• Ricky Luker to submit work orders to shops for building support upon request
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-bryant-denny-stadium-ua-electrical-maintenance-2/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180605T080000
DTEND;TZID=America/Chicago:20180606T050000
DTSTAMP:20260406T215802
CREATED:20181008T201553Z
LAST-MODIFIED:20181008T201553Z
UID:775-1528185600-1528261200@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Bicycle Shop Operation Center Demolition \, UA# 424-17-1246
DESCRIPTION:Planning is complete for an upcoming electrical shutdown in order to remove power to the Bicycle Shop Operation Center to allow for demolition.This shutdown is scheduled for Wednesday\, June 6th\, 2018 from 5:00 AM to 8:00 AM\, but could end sooner.\nThis will impact power to EHS\, Student Media and the Theater and Dance buildings.\nNotes:\n• UA Electrical is aware and will perform the disconnection\n• Student Media is on back-up emergency generator and all equipment will stay operational\n• Student Media fire alarm system is on the emergency generator and will remain operational\n• EHS & Theater and Dance do not have a back-up emergency generator but fire alarm systems are on battery back-up and will remain operational\n• UA HVAC to verify all A/C equipment is operational once power is restored to EHS\, Student Media\, & Theater and Dance
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-bicycle-shop-operation-center-demolition-ua-424-17-1246/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180605T100000
DTEND;TZID=America/Chicago:20180605T110000
DTSTAMP:20260406T215802
CREATED:20181008T204522Z
LAST-MODIFIED:20181015T160025Z
UID:901-1528192800-1528196400@constructionpublicinfo.ua.edu
SUMMARY:Ruby Tyler Renovation for Fleet Services
DESCRIPTION:1020-18-1659
URL:https://constructionpublicinfo.ua.edu/bid/ruby-tyler-renovation-for-fleet-services-2/
LOCATION:AL
CATEGORIES:Pre-Bid Conference
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180605T150000
DTEND;TZID=America/Chicago:20180605T160000
DTSTAMP:20260406T215802
CREATED:20181008T204814Z
LAST-MODIFIED:20181015T155633Z
UID:963-1528210800-1528214400@constructionpublicinfo.ua.edu
SUMMARY:Bidgood Behavioral Lab
DESCRIPTION:031-18-1504
URL:https://constructionpublicinfo.ua.edu/bid/bidgood-behavioral-lab-3/
LOCATION:AL
CATEGORIES:Bid Openings
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180607T150000
DTEND;TZID=America/Chicago:20180607T160000
DTSTAMP:20260406T215802
CREATED:20181008T204813Z
LAST-MODIFIED:20181015T155633Z
UID:962-1528383600-1528387200@constructionpublicinfo.ua.edu
SUMMARY:O.I.T. and EHS Parking Lot
DESCRIPTION:TRN-18-1568
URL:https://constructionpublicinfo.ua.edu/bid/o-i-t-and-ehs-parking-lot-3/
LOCATION:AL
CATEGORIES:Bid Openings
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180607T170000
DTEND;TZID=America/Chicago:20180607T170000
DTSTAMP:20260406T215802
CREATED:20181008T204137Z
LAST-MODIFIED:20181008T204137Z
UID:845-1528390800-1528390800@constructionpublicinfo.ua.edu
SUMMARY:Peter Bryce Main Building Stabilization
DESCRIPTION:415-14-172
URL:https://constructionpublicinfo.ua.edu/bid/peter-bryce-main-building-stabilization/
LOCATION:AL
CATEGORIES:Prequalifications
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180608T120000
DTEND;TZID=America/Chicago:20180609T070000
DTSTAMP:20260406T215802
CREATED:20181008T201553Z
LAST-MODIFIED:20181008T201553Z
UID:774-1528459200-1528527600@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - University Services Campus Medium Voltage Upgrades \, UA# 000-15-377
DESCRIPTION:Planning is complete for an upcoming electrical shutdown of the University Services Campus.• Impacted buildings include:\no All buildings north of Ruby Tyler Pkwy\no F.C. White Food Service building and Wallace Educational building which are on the south side of Ruby Tyler Pkwy\no The New Kitchen for Bryce and the Main Bryce Hospital will not be impacted\nThis electrical shutdown is scheduled for Saturday\, June 9th\, 2018 from 7:00 AM to 12:00 PM.\nNotes for buildings currently in-use:\n• Business Activities Center\no Has back-up emergency generator\no Fire alarm system on generator and battery back-up and will remain operational\no Building is sprinkled and on city water pressure\no Sewer pump for the west bathrooms is not on the emergency back-up system.  These bathrooms do not need to be used\no No other concerns\n• Procurement Services\no Has back-up emergency generator\no Fire alarm system on generator and battery back-up and will remain operational\no Building is sprinkled and on city water pressure\no No other concerns\n• Ruby Tyler Hall\no Not on emergency back-up power\no FA system on 24 hour battery back-up and will remain operational\no Building is sprinkled and on city water pressure\no No other concerns\n• New Automotive Services\no Has back-up emergency generator\no Fire alarm system on generator and battery back-up\no Building is sprinkled and on city water pressure\no No other concerns\n• Bus Maintenance Garage\no Has back-up emergency generator\no Fire alarm system on generator and battery back-up and will remain operational\no Building is sprinkled and on city water pressure\no No other concerns\n• Bus Fueling Station\no Has back-up emergency generator\n• Cottage 8 (Equestrian)\no Not on emergency back-up power\no FA system on 24 hour battery back-up\no Building is sprinkled and on city water pressure\no No other concerns\n• Cottage 9 (Const. Admin.)\no Not on emergency back-up power\no FA system on 24 hour battery back-up and will remain operational\no Building is sprinkled and on city water pressure\no No other concerns\nGeneral notes:\n• UA Facilities to verify start-up of equipment once power is restored\n• All computers will need to be powered down prior to start of shutdown\n• Alison Ferrer to submit work orders to UA HVAC\, UA Elect\, UA Plumb \nKelton Kite to contact personnel from each shop when power is being restored:\nUA Plumb: 205-561-4148\nUA HVAC: 205-361-2124\nUA Elect: 205-210-1738
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-university-services-campus-medium-voltage-upgrades-ua-000-15-377-2/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180612T100000
DTEND;TZID=America/Chicago:20180612T110000
DTSTAMP:20260406T215802
CREATED:20181008T204521Z
LAST-MODIFIED:20181015T160024Z
UID:900-1528797600-1528801200@constructionpublicinfo.ua.edu
SUMMARY:Rodgers Science & Engineering Library Fire Alarm System Upgrade
DESCRIPTION:250-18-1612
URL:https://constructionpublicinfo.ua.edu/bid/rodgers-science-engineering-library-fire-alarm-system-upgrade-2/
LOCATION:AL
CATEGORIES:Pre-Bid Conference
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180612T130000
DTEND;TZID=America/Chicago:20180612T133000
DTSTAMP:20260406T215802
CREATED:20181008T204813Z
LAST-MODIFIED:20181015T202617Z
UID:961-1528808400-1528810200@constructionpublicinfo.ua.edu
SUMMARY:Bryant Conference Center\, Sellers Auditorium
DESCRIPTION:301-17-1275
URL:https://constructionpublicinfo.ua.edu/bid/bryant-conference-center-sellers-auditorium-2/
LOCATION:AL
CATEGORIES:Bid Openings
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180612T170000
DTEND;TZID=America/Chicago:20180612T170000
DTSTAMP:20260406T215802
CREATED:20181008T204136Z
LAST-MODIFIED:20181008T204136Z
UID:844-1528822800-1528822800@constructionpublicinfo.ua.edu
SUMMARY:Project Delivery Services Renovation Cottage #1
DESCRIPTION:1024-18-1349
URL:https://constructionpublicinfo.ua.edu/bid/project-delivery-services-renovation-cottage-1/
LOCATION:AL
CATEGORIES:Prequalifications
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180614T070000
DTEND;TZID=America/Chicago:20180614T170000
DTSTAMP:20260406T215802
CREATED:20181008T201551Z
LAST-MODIFIED:20181008T201551Z
UID:773-1528959600-1528995600@constructionpublicinfo.ua.edu
SUMMARY:Gas Outage - Capstone Parking Deck\, UA# 680-15-363
DESCRIPTION:Planning is complete for an upcoming gas outage in order to relocate an existing gas line that is in conflict the installation of a storm drain for the captioned project.This outage is scheduled for Thursday\, June 14th\, 2018 from 7:00 AM to 5:00 PM.\nThis will impact gas service to Moody Music Building\, Bryant Conference Center and Bryant Museum.\nNotes:\n• This will impact the domestic (hot) water\n• This will impact building reheat for all 3 buildings. Slightly lower building temps should be expected\n• UA Plumbing to shutoff/turn on gas at closest valve\n• UA Plumbing and UA HVAC will restart all gas equipment once work is complete
URL:https://constructionpublicinfo.ua.edu/bid/gas-outage-capstone-parking-deck-ua-680-15-363/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180614T130000
DTEND;TZID=America/Chicago:20180614T170000
DTSTAMP:20260406T215802
CREATED:20181008T201550Z
LAST-MODIFIED:20181008T201550Z
UID:772-1528981200-1528995600@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - University Hall\, UA# 420-17-1006
DESCRIPTION:This shutdown has been rescheduled for Thursday\, June 14th\, 2018 from 1:00 PM to 5:00 PM.This will shutoff power to Bryant-Jordan Hall\, Bryce Superintendents Building and will impact construction power to the main Bryce Hospital.\nNotes:\n• Fire Alarm system for Bryant-Jordan Hall is on battery back-up and will remain operational\n• UA Facilities to perform walk-thru of Bryant-Jordan Hall once power is restored.\n• No other concerns to other buildings noted.
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-university-hall-ua-420-17-1006/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180618T110000
DTEND;TZID=America/Chicago:20180618T110000
DTSTAMP:20260406T215802
CREATED:20181008T202036Z
LAST-MODIFIED:20181008T203401Z
UID:818-1529319600-1529319600@constructionpublicinfo.ua.edu
SUMMARY:Theta Tau Renovation (UA#931-18-1689)
DESCRIPTION:RFQ
URL:https://constructionpublicinfo.ua.edu/bid/theta-tau-renovation-ua931-18-1689/
LOCATION:AL
CATEGORIES:RFQs
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180619T150000
DTEND;TZID=America/Chicago:20180619T160000
DTSTAMP:20260406T215802
CREATED:20181008T204812Z
LAST-MODIFIED:20181015T155632Z
UID:960-1529420400-1529424000@constructionpublicinfo.ua.edu
SUMMARY:Ruby Tyler Renovation for Fleet Services
DESCRIPTION:1020-18-1659
URL:https://constructionpublicinfo.ua.edu/bid/ruby-tyler-renovation-for-fleet-services-3/
LOCATION:AL
CATEGORIES:Bid Openings
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180621T070000
DTEND;TZID=America/Chicago:20180621T120000
DTSTAMP:20260406T215802
CREATED:20181008T201550Z
LAST-MODIFIED:20181008T201550Z
UID:771-1529564400-1529582400@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - University Hall Renovation \, UA# 420-17-1006
DESCRIPTION:Planning is complete for an upcoming electrical shutdown for the University Hall Renovation project.This shutdown is scheduled for Saturday\, July 21st\, 2018 from 7:00 AM to 12:00 PM.\nThis will impact normal power to Capital Hall\, Bryant-Jordan Hall\, the Bryce Main and old Superintendents building.\nNotes:\n• UA Electrical to coordinate “hot ties” with Alabama Power.  This allows for isolation of only the buildings noted above.  The Harper Center on Bryce campus will not be impacted\n• Capital Hall\no Has back-up emergency generator\no Fire alarm system is on emergency generator and will remain operational\no Fire pump is on emergency generator so the fire sprinkler system will remain operational\no UA HVAC to shutoff and restart equipment\no UA Plumbing – No items of concern noted\no UA Elevator to shutdown and secure the elevators\no Access control (card access) on west side of building will not be operational\no All computers need to be powered down prior to electrical shutdown\n• Bryant-Jordan Hall\no Fire Alarm system is on battery back-up and will remain operational\no UA HVAC to shutoff and restart equipment\no UA Plumbing – No items of concern noted\no All computers need to be powered down prior to electrical shutdown\n• UA Facilities to perform walk-thru of both buildings once power is restored
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-university-hall-renovation-ua-420-17-1006/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180621T100000
DTEND;TZID=America/Chicago:20180621T110000
DTSTAMP:20260406T215802
CREATED:20181008T204520Z
LAST-MODIFIED:20181015T160024Z
UID:899-1529575200-1529578800@constructionpublicinfo.ua.edu
SUMMARY:Project Delivery Services Renovation Cottage #1
DESCRIPTION:1024-18-1349
URL:https://constructionpublicinfo.ua.edu/bid/project-delivery-services-renovation-cottage-1-3/
LOCATION:AL
CATEGORIES:Pre-Bid Conference
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180622T050000
DTEND;TZID=America/Chicago:20180622T070000
DTSTAMP:20260406T215802
CREATED:20181008T201549Z
LAST-MODIFIED:20181008T201549Z
UID:770-1529643600-1529650800@constructionpublicinfo.ua.edu
SUMMARY:Fire Sprinkler Outage Coordination - Mal Moore Athletic Facility Recruiting Room Upgrades\, UA# 085-18-1485
DESCRIPTION:Planning is complete for an upcoming fire sprinkler outage at the Mal Moore Athletic Facility in order to relocate existing fire sprinkler heads on the 1st floor\, north end. This outage is scheduled for Friday\, June 22nd\, 2018 from 5:00 AM to 7:00 AM.\nThis will not be an entire building outage.  It should only impact a portion of the building on the 1st floor\, north end.\nNotes:\n• UA Plumbing shop will valve off the system and refill once work is complete\n• Contractor to drain the system and make the tie-in\n• EHS to bypass the flow switches prior to refilling the system\n• Fire watch not required due to duration being less than 4 hours
URL:https://constructionpublicinfo.ua.edu/bid/fire-sprinkler-outage-coordination-mal-moore-athletic-facility-recruiting-room-upgrades-ua-085-18-1485/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180626T100000
DTEND;TZID=America/Chicago:20180626T110000
DTSTAMP:20260406T215802
CREATED:20181008T204812Z
LAST-MODIFIED:20181015T155632Z
UID:959-1530007200-1530010800@constructionpublicinfo.ua.edu
SUMMARY:Rodgers Science & Engineering Library Fire Alarm System Upgrade
DESCRIPTION:250-18-1612
URL:https://constructionpublicinfo.ua.edu/bid/rodgers-science-engineering-library-fire-alarm-system-upgrade-3/
LOCATION:AL
CATEGORIES:Bid Openings
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180626T170000
DTEND;TZID=America/Chicago:20180626T170000
DTSTAMP:20260406T215802
CREATED:20181008T204135Z
LAST-MODIFIED:20181008T204135Z
UID:843-1530032400-1530032400@constructionpublicinfo.ua.edu
SUMMARY:Alpha Gamma Delta Addition
DESCRIPTION:904-18-1364
URL:https://constructionpublicinfo.ua.edu/bid/alpha-gamma-delta-addition/
LOCATION:AL
CATEGORIES:Prequalifications
ORGANIZER;CN="Suzanne Webster":MAILTO:scirbywebster@ua.edu
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180627T090000
DTEND;TZID=America/Chicago:20180627T140000
DTSTAMP:20260406T215802
CREATED:20181008T201548Z
LAST-MODIFIED:20181008T201548Z
UID:769-1530090000-1530108000@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Ridgecrest South Outside Air System Replacement \, UA# 271-17-1392
DESCRIPTION:Planning is complete for an upcoming electrical shutdown of Ridgecrest South in order to tie-in power to the new outside air units.This shutdown is scheduled for Wednesday\, June 27th\, 2018 from 9:00 AM to 2:00 PM.\nThis will impact all electrical and mechanical systems.\nNotes:\n• Building is on back-up emergency generator\n• Fire alarm system will remain operational\n• Fire pump is on the emergency power system and will remain operational\n• Mike Largin to contact Ray Bostick and Randy Mathis to discuss details about the data equipment area.  It was mentioned in the meeting that all data equipment and A/C for this area is on the emergency power system and will remain operational\n• UA HVAC to shutoff all equipment and verify startup once power is restored\n• UA Plumbing to verify impact on all plumbing equipment and verify startup once power is restored\n• UA Elevator to shutdown and secure all elevators\n• Parking deck roll up doors will not be operational.  They will need to remain in the open position\n• The faculty apartment is currently the only room occupied
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-ridgecrest-south-outside-air-system-replacement-ua-271-17-1392/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180628T080000
DTEND;TZID=America/Chicago:20180628T120000
DTSTAMP:20260406T215802
CREATED:20181008T204520Z
LAST-MODIFIED:20181015T160024Z
UID:898-1530172800-1530187200@constructionpublicinfo.ua.edu
SUMMARY:Peter Bryce Main Building Stabilization
DESCRIPTION:415-14-172
URL:https://constructionpublicinfo.ua.edu/bid/peter-bryce-main-building-stabilization-2/
LOCATION:AL
CATEGORIES:Pre-Bid Conference
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180629T050000
DTEND;TZID=America/Chicago:20180629T090000
DTSTAMP:20260406T215802
CREATED:20181008T201545Z
LAST-MODIFIED:20181008T201545Z
UID:768-1530248400-1530262800@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Tutwiler Hall \, UA Electrical Maintenance
DESCRIPTION:Planning is complete for an upcoming electrical shutdown of Tutwiler Dorm\, including the energy plant and the 2-level wing connected to Tutwiler in order to perform preventive maintenance.This shutdown is scheduled for Friday\, June 29th\, 2018 from 5:0O AM to 9:00 AM.\nThis will impact all electrical and mechanical systems.\nNotes:\n• Tutwiler is on back-up emergency generator\n• Fire alarm system is on the generator and will remain operational\n• Fire pump will remain operational\n• UA HVAC to shutoff all mechanical equipment and verify startup\n• UA Plumbing to verify startup of booster pumps and sump pump in energy plant\n• UA Elevator to shutdown and secure the elevators\n• Ricky Luker to submit work orders to shops\nPlease direct any questions regarding this shutdown to Ricky Luker. (205) 361-1664
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-tutwiler-hall-ua-electrical-maintenance/
LOCATION:AL