BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Construction Public Information - ECPv6.5.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Construction Public Information
X-ORIGINAL-URL:https://constructionpublicinfo.ua.edu
X-WR-CALDESC:Events for Construction Public Information
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20180311T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20181104T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180703T060000
DTEND;TZID=America/Chicago:20180703T140000
DTSTAMP:20260407T014945
CREATED:20181008T201544Z
LAST-MODIFIED:20181008T201544Z
UID:767-1530597600-1530626400@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Stadium Drive Deck
DESCRIPTION:There will be a scheduled power outage on the Stadium Drive Deck (South Ten Hoor Deck) in order for UA Electrical to perform some PM work.This outage is scheduled for July 3\, 2018\, from 6:00 AM until 2:00 PM.
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-stadium-drive-deck/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180703T170000
DTEND;TZID=America/Chicago:20180703T170000
DTSTAMP:20260407T014945
CREATED:20181008T204133Z
LAST-MODIFIED:20181008T204133Z
UID:842-1530637200-1530637200@constructionpublicinfo.ua.edu
SUMMARY:The Univ. of Al. Economic Development Resource Center
DESCRIPTION:712-17-1081
URL:https://constructionpublicinfo.ua.edu/bid/the-univ-of-al-economic-development-resource-center/
LOCATION:AL
CATEGORIES:Prequalifications
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180705T073000
DTEND;TZID=America/Chicago:20180705T160000
DTSTAMP:20260407T014945
CREATED:20181008T201543Z
LAST-MODIFIED:20181008T201543Z
UID:766-1530775800-1530806400@constructionpublicinfo.ua.edu
SUMMARY:Water Outage - Presidential Villgae II\, Ua Plumbing Maintenance
DESCRIPTION:A complete domestic water outage at Presidential Village II in order for UA Plumbing to make some repairs.This is scheduled for Thursday\, July 5th\, 2018 from 7:30 AM to 4:00 PM.
URL:https://constructionpublicinfo.ua.edu/bid/water-outage-presidential-villgae-ii-ua-plumbing-maintenance/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180707T060000
DTEND;TZID=America/Chicago:20180707T110000
DTSTAMP:20260407T014945
CREATED:20181008T201542Z
LAST-MODIFIED:20181008T201542Z
UID:765-1530943200-1530961200@constructionpublicinfo.ua.edu
SUMMARY:Water Outage - University Aervices Campus
DESCRIPTION:Planning is complete for a water outage on the USC (Partlow Campus) in order to perform some necessary maintenance on the water line.This outage is scheduled for July 7th\,  from 6:00 am until 11:00 am.\nBuildings impacted include:\n                Business Activities\n                Procurement\n                HR\n                Latham
URL:https://constructionpublicinfo.ua.edu/bid/water-outage-university-aervices-campus/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180709T090000
DTEND;TZID=America/Chicago:20180709T140000
DTSTAMP:20260407T014945
CREATED:20181008T201542Z
LAST-MODIFIED:20181008T201542Z
UID:764-1531126800-1531144800@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Riverside East and North Residential \, UA Electrical Maintenance
DESCRIPTION:Planning is complete for an upcoming electrical shutdown of Riverside East and North Residential in order to perform preventive maintenance.This shutdown is scheduled for Monday\, July 9th\, 2018 from 9:0O AM to 2:00 PM.\nThis will impact all electrical and mechanical systems.\nNotes:\n• Riverside E and N does not have back-up emergency generator\n• Fire alarm system is on battery backup and will remain operational\n• Fire sprinkler system for both buildings is operated from the Presidential Village 1 fire pump and will remain operational\n• UA HVAC to shutoff all mechanical equipment and verify startup\n• UA Elevator to shutdown and secure the elevators\n• There are no summer camps in Riverside E & N on this day\n• Ricky Luker to submit work orders to shops\nPlease direct any questions regarding this shutdown to Ricky Luker. (205) 361-1664
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-riverside-east-and-north-residential-ua-electrical-maintenance/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180710T130000
DTEND;TZID=America/Chicago:20180710T140000
DTSTAMP:20260407T014945
CREATED:20181008T204519Z
LAST-MODIFIED:20181015T160024Z
UID:897-1531227600-1531231200@constructionpublicinfo.ua.edu
SUMMARY:Alpha Gamma Delta Addition
DESCRIPTION:904-18-1364
URL:https://constructionpublicinfo.ua.edu/bid/alpha-gamma-delta-addition-2/
LOCATION:AL
CATEGORIES:Pre-Bid Conference
ORGANIZER;CN="Suzanne Webster":MAILTO:scirbywebster@ua.edu
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180712T050000
DTEND;TZID=America/Chicago:20180712T070000
DTSTAMP:20260407T014945
CREATED:20181008T201541Z
LAST-MODIFIED:20181008T201541Z
UID:763-1531371600-1531378800@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Garland Hall \, UA Building Maintenance Clark Hall Exterior Enhancements
DESCRIPTION:Planning is complete for an upcoming electrical shutdown of Garland Hall in order to tie-in an exterior lighting circuit for the subject project.This shutdown is scheduled for Thursday\, July 12th\, 2018 from 5:00 AM to 7:00 AM.\nNotes:\n• Garland Hall does not have an emergency generator\n• Fire alarm system is on battery backup and will remain operational\n• All computers within the building will need to shutoff prior to the shutdown\n• UA Electrical to submit work orders to UA HVAC\, UA Plumbing and UA Elevator for building support.
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-garland-hall-ua-building-maintenance-clark-hall-exterior-enhancements/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180712T070000
DTEND;TZID=America/Chicago:20180712T080000
DTSTAMP:20260407T014945
CREATED:20181008T201539Z
LAST-MODIFIED:20181008T201539Z
UID:762-1531378800-1531382400@constructionpublicinfo.ua.edu
SUMMARY:Fire Sprinkler Outage - Mal Moore Athletic Facility Recruiting Room Upgrades \, UA# 085-18-1485
DESCRIPTION:Planning is complete for an upcoming fire sprinkler outage at the Mal Moore Athletic Facility.This outage is scheduled for Thursday\, July 12th\, 2018 from 7:00 AM to 8:00 AM.\nThis will not be an entire building outage.\nPlumbing Shop and EHS are aware.\nNotes:\n• UA Plumbing shop will valve off the system and refill once work is complete\n• Contractor to drain the system and make the tie-in\n• EHS to bypass the flow switches prior to refilling the system\n• Fire watch not required due to duration being less than 4 hours\n• Alison Ferrer to submit work orders to UA Plumbing and UA EHS
URL:https://constructionpublicinfo.ua.edu/bid/fire-sprinkler-outage-mal-moore-athletic-facility-recruiting-room-upgrades-ua-085-18-1485/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180712T140000
DTEND;TZID=America/Chicago:20180712T150000
DTSTAMP:20260407T014945
CREATED:20181008T204518Z
LAST-MODIFIED:20181015T160023Z
UID:896-1531404000-1531407600@constructionpublicinfo.ua.edu
SUMMARY:The Univ. of Al. Economic Development Resource Center
DESCRIPTION:712-17-1081
URL:https://constructionpublicinfo.ua.edu/bid/the-univ-of-al-economic-development-resource-center-2/
LOCATION:AL
CATEGORIES:Pre-Bid Conference
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180713T080000
DTEND;TZID=America/Chicago:20180713T110000
DTSTAMP:20260407T014945
CREATED:20181008T201538Z
LAST-MODIFIED:20181008T201538Z
UID:760-1531468800-1531479600@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - New Freshman Residence Hall \, UA# 272-16-952
DESCRIPTION:Planning is complete for an upcoming electrical shutdown in order to remove the temporary construction power for the New Freshman Res. Hall project.This shutdown is scheduled for July 13th\, 2018 from 8:00 AM to 11:00 AM.\nNotes:\n• This will essentially have no impact on any adjacent buildings\n• This will require the transformer serving the emergency power system of Ridgecrest E & W to be de-energized\, thus\, causing the emergency generator to respond.  Once emergency generator responds within seconds\, Ridgecrest E & W will function as normal again\n• The fire pump will remain operational once the generator responds\n• UA Electrical to perform power shutdown\n• UA HVAC to verify if A/C units for data closet are on e-power and verify if operational
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-new-freshman-residence-hall-ua-272-16-952/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180713T080000
DTEND;TZID=America/Chicago:20180713T140000
DTSTAMP:20260407T014945
CREATED:20181008T201539Z
LAST-MODIFIED:20181008T201539Z
UID:761-1531468800-1531490400@constructionpublicinfo.ua.edu
SUMMARY:Water Outage - University Services Campus Water Lines \, UA# UTL-18-1449
DESCRIPTION:The work for this outage was performed Thursday\, July 13th\, 2018 due to the existing water line rupturing\, forcing an emergency outage.  \nBuildings impacted include:\n                Business Activities\n                Procurement\n                Ruby Tyler\n                Cottages 5\, 8 and 9
URL:https://constructionpublicinfo.ua.edu/bid/water-outage-university-services-campus-water-lines-ua-utl-18-1449/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20180716
DTEND;VALUE=DATE:20180719
DTSTAMP:20260407T014945
CREATED:20181008T201537Z
LAST-MODIFIED:20181008T201537Z
UID:759-1531699200-1531958399@constructionpublicinfo.ua.edu
SUMMARY:Steam Outage - Athletic Energy Plant \, UA Plumbing Maintenance
DESCRIPTION:UA Plumbing will need to shutdown the steam system feeding Coleman Coliseum\, the Indoor Practice Facility\, the and Strength and Conditioning Facility in order to make repairs to the steam line.This shutdown is scheduled to start Monday night\, July 16th\, 2018 and last until sometime on Wednesday\, July 18th\, 2018.\nThis will only impact the reheating for the buildings listed above.\nAthletics is aware that these buildings could possibly see slightly lower temps than normal.\nUA HVAC will make adjustments to regulate temps.
URL:https://constructionpublicinfo.ua.edu/bid/steam-outage-athletic-energy-plant-ua-plumbing-maintenance/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180716T120000
DTEND;TZID=America/Chicago:20180716T120000
DTSTAMP:20260407T014945
CREATED:20181008T202035Z
LAST-MODIFIED:20181008T203453Z
UID:816-1531742400-1531742400@constructionpublicinfo.ua.edu
SUMMARY:Paty Residence Hall Renovation (UA#247-18-1697)
DESCRIPTION:RFQ
URL:https://constructionpublicinfo.ua.edu/bid/paty-residence-hall-renovation-ua247-18-1697/
LOCATION:AL
CATEGORIES:RFQs
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180716T120000
DTEND;TZID=America/Chicago:20180716T120000
DTSTAMP:20260407T014945
CREATED:20181008T202036Z
LAST-MODIFIED:20181008T203535Z
UID:817-1531742400-1531742400@constructionpublicinfo.ua.edu
SUMMARY:Biology Building Renovation (UA#034-18-0000)
DESCRIPTION:RFQ
URL:https://constructionpublicinfo.ua.edu/bid/biology-building-renovation-ua034-18-0000/
LOCATION:AL
CATEGORIES:RFQs
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180717T050000
DTEND;TZID=America/Chicago:20180717T123000
DTSTAMP:20260407T014945
CREATED:20181008T201536Z
LAST-MODIFIED:20181008T201536Z
UID:758-1531803600-1531830600@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Friedman Hall\, Maxwell Hall and Graves Hall \, UA Electrical Maintenance
DESCRIPTION:Planning is complete for an upcoming electrical shutdown of Friedman Hall and Maxwell Hall in order for UA Electrical to perform preventive maintenance.This shutdown is scheduled for Tuesday\, July 17th\, 2018 from 5:00 AM to 12:30 PM.\n**Graves Hall could possibly be shutdown for 30 minutes at the beginning and ending of the above timeframe.\nNotes:\n• Friedman Hall and Maxwell Hall do not have a back-up emergency generator\n• Fire alarm systems for all buildings are on battery back-up and will remain operational\n• No other building concerns\n• No concerns at Graves Hall due to short duration of outages
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-friedman-hall-maxwell-hall-and-graves-hall-ua-electrical-maintenance/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180719T080000
DTEND;TZID=America/Chicago:20180719T170000
DTSTAMP:20260407T014945
CREATED:20181008T201535Z
LAST-MODIFIED:20181008T201535Z
UID:757-1531987200-1532019600@constructionpublicinfo.ua.edu
SUMMARY:Fire Sprinkler Outage - Capital Hall 2nd Floor Renovation for Title IX Office \, UA# 419-18-1684
DESCRIPTION:Planning is complete for an upcoming fire sprinkler outage at Capital Hall in order to relocate a couple of existing sprinkler heads.This outage is scheduled for Thursday\, July 19th\, 2018 from 8:00 AM to 5:00 PM.\nNotes:\n• Global Fire will perform shutoff and drain the system.  UA Plumbing is ok with this since Global is familiar with the system\n• This will not impact the entire building.  Global is aware of location of isolation valves\n• UA EHS to zone off fire alarm system and bypass the flow switches\n• Global to provide fire watch due to duration of outage\n• Work order has already been sent to UA EHS
URL:https://constructionpublicinfo.ua.edu/bid/fire-sprinkler-outage-capital-hall-2nd-floor-renovation-for-title-ix-office-ua-419-18-1684/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180719T110000
DTEND;TZID=America/Chicago:20180719T120000
DTSTAMP:20260407T014945
CREATED:20181008T204811Z
LAST-MODIFIED:20181015T155632Z
UID:958-1531998000-1532001600@constructionpublicinfo.ua.edu
SUMMARY:Project Delivery Services Renovation Cottage #1
DESCRIPTION:1024-18-1349
URL:https://constructionpublicinfo.ua.edu/bid/project-delivery-services-renovation-cottage-1-5/
LOCATION:AL
CATEGORIES:Bid Openings
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180724T073000
DTEND;TZID=America/Chicago:20180724T100000
DTSTAMP:20260407T014945
CREATED:20181008T201535Z
LAST-MODIFIED:20181008T201535Z
UID:756-1532417400-1532426400@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - 401 Queen City Ave. Building (Old System's Office) \, Alabama Power Co.
DESCRIPTION:Alabama Power Co. will need to shutoff power to 401 Queen City Ave. in order to fix an issue caused by a recent storm event.This shutdown is scheduled for Tuesday\, July 24th\, 2018 starting at 7:30 AM and could last approx. 2 hours.\nNotes:\n• Building rep is aware and will coordinate shutdown with building occupants\n• Please shutdown all computers and electronic equipment prior to the interruption\n• UA Facilities will need to address any concerns involving building components\nPlease contact Ricky Luker (UA Electrical) at 348-3961 if you have any concerns.
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-401-queen-city-ave-building-old-systems-office-alabama-power-co/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180724T130000
DTEND;TZID=America/Chicago:20180724T140000
DTSTAMP:20260407T014945
CREATED:20181008T204810Z
LAST-MODIFIED:20181015T155632Z
UID:957-1532437200-1532440800@constructionpublicinfo.ua.edu
SUMMARY:Alpha Gamma Delta Addition
DESCRIPTION:904-18-1364
URL:https://constructionpublicinfo.ua.edu/bid/alpha-gamma-delta-addition-3/
LOCATION:AL
CATEGORIES:Bid Openings
ORGANIZER;CN="Suzanne Webster":MAILTO:scirbywebster@ua.edu
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180724T160000
DTEND;TZID=America/Chicago:20180724T180000
DTSTAMP:20260407T014945
CREATED:20181008T201534Z
LAST-MODIFIED:20181008T201534Z
UID:755-1532448000-1532455200@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Tutwiler Hall \, UA Building Maintenance
DESCRIPTION:Planning is complete for an upcoming electrical shutdown of Tutwiler Hall.This shutdown is scheduled for Tuesday\, July 24th\, 2018 from 4:00 PM to 6:00 PM.\nNotes:\n• Building has a back-up emergency generator\n• Fire Alarm system will remain operational\n• Building does not have camps this day and should only be occupied by a few staff\n• UA HVAC to shutoff HVAC equipment and restart once power is restored\n• No concerns with plumbing equipment\n• UA Elevator Maint. will need to shutoff and secure the elevators\n• Michael Sumners to submit work orders to UA Elect\, UA HVAC and UA Elevator Maint.
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-tutwiler-hall-ua-building-maintenance/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180724T170000
DTEND;TZID=America/Chicago:20180724T170000
DTSTAMP:20260407T014945
CREATED:20181008T204131Z
LAST-MODIFIED:20181008T204131Z
UID:841-1532451600-1532451600@constructionpublicinfo.ua.edu
SUMMARY:Aquatic Center Renovation
DESCRIPTION:219-18-1324
URL:https://constructionpublicinfo.ua.edu/bid/aquatic-center-renovation/
LOCATION:AL
CATEGORIES:Prequalifications
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180725T230000
DTEND;TZID=America/Chicago:20180726T070000
DTSTAMP:20260407T014945
CREATED:20181008T201534Z
LAST-MODIFIED:20181008T201534Z
UID:754-1532559600-1532588400@constructionpublicinfo.ua.edu
SUMMARY:Gas Outage - Tutwiler Hall and Transit Maint. Facility \, UA Plumbing Maintenance
DESCRIPTION:The UA Plumbing Dept. will be shutting off gas to Tutwiler Hall and the Transit Maint. Facility (University Services Campus) for maintenance reasons.This outage is scheduled for Wednesday\, July 25th\, 2018 from 11:00 PM to 7:00 AM.\nThis will impact the domestic hot water for both buildings.\nAccording to UA HVAC\, this should only impact the building reheat system for the Mathlab at Tutwiler.  Expect slightly lower inside temperatures.
URL:https://constructionpublicinfo.ua.edu/bid/gas-outage-tutwiler-hall-and-transit-maint-facility-ua-plumbing-maintenance/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180728T070000
DTEND;TZID=America/Chicago:20180728T120000
DTSTAMP:20260407T014945
CREATED:20181008T201532Z
LAST-MODIFIED:20181008T201532Z
UID:753-1532761200-1532779200@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - University Services Campus Medium Voltage Upgrades \, UA# 000-15-377
DESCRIPTION:Planning is complete for an upcoming electrical shutdown of the University Services Campus.• Impacted buildings include:\no All buildings north of Ruby Tyler Pkwy\no F.C. White Food Service building and Wallace Educational building which are on the south side of Ruby Tyler Pkwy\no The New Kitchen for Bryce and the Main Bryce Hospital will not be impacted\nThis electrical shutdown is scheduled for Saturday\, July 28th\, 2018 from 7:00 AM to 12:00 PM.\nNotes for buildings currently in-use:\n• Business Activities Center\no Has back-up emergency generator\no Fire alarm system on generator and battery back-up and will remain operational\no Building is sprinkled and on city water pressure\no Sewer pump for the west bathrooms is not on the emergency back-up system.  These bathrooms do not need to be used\no No other concerns\n• Procurement Services\no Has back-up emergency generator\no Fire alarm system on generator and battery back-up and will remain operational\no Building is sprinkled and on city water pressure\no No other concerns\n• Ruby Tyler Hall\no Not on emergency back-up power\no FA system on 24 hour battery back-up and will remain operational\no Building is sprinkled and on city water pressure\no No other concerns\n• New Automotive Services\no Has back-up emergency generator\no Fire alarm system on generator and battery back-up\no Building is sprinkled and on city water pressure\no No other concerns\n• Bus Maintenance Garage\no Has back-up emergency generator\no Fire alarm system on generator and battery back-up and will remain operational\no Building is sprinkled and on city water pressure\no No other concerns\n• Bus Fueling Station\no Has back-up emergency generator\n• Cottage 8 (Equestrian)\no Not on emergency back-up power\no FA system on 24 hour battery back-up\no Building is sprinkled and on city water pressure\no No other concerns\n• Cottage 9 (Const. Admin.)\no Not on emergency back-up power\no FA system on 24 hour battery back-up and will remain operational\no Building is sprinkled and on city water pressure\no No other concerns\nGeneral notes:\n• UA Facilities to verify start-up of equipment once power is restored\n• All computers will need to be powered down prior to start of shutdown\n• Alison Ferrer to submit work orders to UA HVAC\, UA Elect\, UA Plumb \nKelton Kite to contact personnel from each shop when power is being restored:\nUA Plumb: 205-561-4148\nUA HVAC: 205-361-2124\nUA Elect: 205-210-1738
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-university-services-campus-medium-voltage-upgrades-ua-000-15-377/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180731T140000
DTEND;TZID=America/Chicago:20180731T150000
DTSTAMP:20260407T014945
CREATED:20181008T204810Z
LAST-MODIFIED:20181015T155632Z
UID:956-1533045600-1533049200@constructionpublicinfo.ua.edu
SUMMARY:The Univ. of Al. Economic Development Resource Center
DESCRIPTION:712-17-1081
URL:https://constructionpublicinfo.ua.edu/bid/the-univ-of-al-economic-development-resource-center-3/
LOCATION:AL
CATEGORIES:Bid Openings
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180731T170000
DTEND;TZID=America/Chicago:20180731T170000
DTSTAMP:20260407T014945
CREATED:20181008T204131Z
LAST-MODIFIED:20181008T204131Z
UID:840-1533056400-1533056400@constructionpublicinfo.ua.edu
SUMMARY:University Services Campus Sanitary Sewer Repair & Replacement
DESCRIPTION:UTL-18-1631
URL:https://constructionpublicinfo.ua.edu/bid/university-services-campus-sanitary-sewer-repair-replacement/
LOCATION:AL
CATEGORIES:Prequalifications
END:VEVENT
END:VCALENDAR