BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Construction Public Information - ECPv6.5.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Construction Public Information
X-ORIGINAL-URL:https://constructionpublicinfo.ua.edu
X-WR-CALDESC:Events for Construction Public Information
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20180311T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20181104T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180902T063000
DTEND;TZID=America/Chicago:20180902T073000
DTSTAMP:20260406T095100
CREATED:20181008T201517Z
LAST-MODIFIED:20181008T201517Z
UID:748-1535869800-1535873400@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Morgan Hall \, UA Electrical Maintenance
DESCRIPTION:Planning is complete for an upcoming electrical shutdown of Morgan Hall in order for UA Electrical to perform preventive maintenance.This shutdown is scheduled for Sunday\, September 2nd\, 2018 from 6:30 AM to 7:30 AM.\nNotes:\n• Building does not have a back-up emergency generator\n• Fire alarm system is on battery back-up and will remain operational\n• Building rep is aware and will notify occupants to turn off all computers prior to shutdown\n• Theatre and Dance is aware.  The auditorium in Morgan Hall will be used Sunday afternoon for rehearsals\n• Morgan Hall has a sump pump.  If rain is expected\, then UA Plumbing says shutdown should be rescheduled or the sump pump needs to be place on temporary generator.\n• UA Elevator will shutdown and secure the 1 elevator
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-morgan-hall-ua-electrical-maintenance/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180904T170000
DTEND;TZID=America/Chicago:20180904T170000
DTSTAMP:20260406T095100
CREATED:20181008T204128Z
LAST-MODIFIED:20181008T204128Z
UID:837-1536080400-1536080400@constructionpublicinfo.ua.edu
SUMMARY:Carmichael Hall Elevator Upgrades
DESCRIPTION:903-18-1673
URL:https://constructionpublicinfo.ua.edu/bid/carmichael-hall-elevator-upgrades/
LOCATION:AL
CATEGORIES:Prequalifications
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180905T050000
DTEND;TZID=America/Chicago:20180905T053000
DTSTAMP:20260406T095100
CREATED:20181008T201514Z
LAST-MODIFIED:20181008T201514Z
UID:747-1536123600-1536125400@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Bidgood Hall Behavioral Lab 249\, UA# 031-18-1504
DESCRIPTION:Planning is complete for an electrical shutdown at Bidgood Hall to test emergency lighting for the new Behavioral Lab 249.The shutdown is scheduled for Wednesday September 5th from 5:00 – 5:30 am. \nNotes:\n• The electrical shop did verify that the emergency generator is in service and functioning properly.\n• The outage will effect Bidgood Hall and the Bruno Library.\n• The outage will only effect normal power\, anything on emergency power will not be effected.\n• UA Electrical will perform the power shutdown.\n• UA Electrical will have a generator tech on site during the shutdown.
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-bidgood-hall-behavioral-lab-249-ua-031-18-1504/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180906T100000
DTEND;TZID=America/Chicago:20180906T110000
DTSTAMP:20260406T095100
CREATED:20181008T204807Z
LAST-MODIFIED:20181015T155630Z
UID:951-1536228000-1536231600@constructionpublicinfo.ua.edu
SUMMARY:Paul W. Bryant Museum Audio Visual Equipment
DESCRIPTION:303-18-1446
URL:https://constructionpublicinfo.ua.edu/bid/paul-w-bryant-museum-audio-visual-equipment-2/
LOCATION:AL
CATEGORIES:Bid Openings
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180911T150000
DTEND;TZID=America/Chicago:20180911T160000
DTSTAMP:20260406T095100
CREATED:20181008T204806Z
LAST-MODIFIED:20181015T155630Z
UID:950-1536678000-1536681600@constructionpublicinfo.ua.edu
SUMMARY:EHS Renovation
DESCRIPTION:1017-17-1073
URL:https://constructionpublicinfo.ua.edu/bid/ehs-renovation-3/
LOCATION:AL
CATEGORIES:Bid Openings
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180911T170000
DTEND;TZID=America/Chicago:20180911T170000
DTSTAMP:20260406T095100
CREATED:20181008T204127Z
LAST-MODIFIED:20181008T204127Z
UID:836-1536685200-1536685200@constructionpublicinfo.ua.edu
SUMMARY:Bryant Conf. Center\, Seller Auditorium Lighting Upgrade
DESCRIPTION:301-18-1651
URL:https://constructionpublicinfo.ua.edu/bid/bryant-conf-center-seller-auditorium-lighting-upgrade/
LOCATION:AL
CATEGORIES:Prequalifications
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180911T170000
DTEND;TZID=America/Chicago:20180911T170000
DTSTAMP:20260406T095100
CREATED:20181008T204127Z
LAST-MODIFIED:20181008T204127Z
UID:835-1536685200-1536685200@constructionpublicinfo.ua.edu
SUMMARY:University Services Campus Warehouse Conversion Phase II
DESCRIPTION:1006-17-1334
URL:https://constructionpublicinfo.ua.edu/bid/university-services-campus-warehouse-conversion-phase-ii/
LOCATION:AL
CATEGORIES:Prequalifications
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180911T170000
DTEND;TZID=America/Chicago:20180911T170000
DTSTAMP:20260406T095100
CREATED:20181008T204127Z
LAST-MODIFIED:20181008T204127Z
UID:834-1536685200-1536685200@constructionpublicinfo.ua.edu
SUMMARY:Paty Hall Asbestos Abatement
DESCRIPTION:247-18-1750
URL:https://constructionpublicinfo.ua.edu/bid/paty-hall-asbestos-abatement/
LOCATION:AL
CATEGORIES:Prequalifications
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180912T080000
DTEND;TZID=America/Chicago:20180912T150000
DTSTAMP:20260406T095100
CREATED:20181008T201513Z
LAST-MODIFIED:20181008T201513Z
UID:746-1536739200-1536764400@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown Coordination - Tutwiler Parking Deck (UA# 782-16-951) \, SW Campus Utilities and Infrastructure (UA# UTL-17-1016)
DESCRIPTION:An electrical shutdown has been planned for the Tutwiler Parking Deck in order for Alabama Power Co. to convert their overhead lines to underground along the north side of 12th St.This work is scheduled to take place on Wednesday\, September 12th\, 2018 from 8:00 AM to 3:00 PM.  The Tutwiler Parking Deck will be without normal power for approx. 3 hours within this timeframe.\nIf weather does not permit for 9/12\, then this work will take place on 9/13 during the same time.\nNotes:\n• The Tutwiler Parking Deck has a back-up emergency generator and will remain operational\n• UA Transportation Services to open gate arms prior to shutdown if needed
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-coordination-tutwiler-parking-deck-ua-782-16-951-sw-campus-utilities-and-infrastructure-ua-utl-17-1016/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180913T150000
DTEND;TZID=America/Chicago:20180913T160000
DTSTAMP:20260406T095100
CREATED:20181008T204513Z
LAST-MODIFIED:20181015T160022Z
UID:890-1536850800-1536854400@constructionpublicinfo.ua.edu
SUMMARY:Carmichael Hall Elevator Upgrades
DESCRIPTION:903-18-1673
URL:https://constructionpublicinfo.ua.edu/bid/carmichael-hall-elevator-upgrades-2/
LOCATION:AL
CATEGORIES:Pre-Bid Conference
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180917T120000
DTEND;TZID=America/Chicago:20180917T120000
DTSTAMP:20260406T095100
CREATED:20181008T202034Z
LAST-MODIFIED:20181015T201652Z
UID:814-1537185600-1537185600@constructionpublicinfo.ua.edu
SUMMARY:Gorgas Library Core Support (UA#013-18-1737)
DESCRIPTION:RFQ \n			\n				\n					\n						\n							\n							Loading...\n						\n					\n					\n						\n							\n							Taking too long?\n						\n						\n							\n								 Reload document							\n							|\n							\n								 Open in new tab							\n					 \n				\n			\n		Download [160.12 KB]
URL:https://constructionpublicinfo.ua.edu/bid/gorgas-library-core-support-ua013-18-1737/
LOCATION:AL
CATEGORIES:RFQs
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180918T100000
DTEND;TZID=America/Chicago:20180918T110000
DTSTAMP:20260406T095101
CREATED:20181008T204512Z
LAST-MODIFIED:20181015T160022Z
UID:889-1537264800-1537268400@constructionpublicinfo.ua.edu
SUMMARY:Paty Hall Asbestos Abatement
DESCRIPTION:247-18-1750
URL:https://constructionpublicinfo.ua.edu/bid/paty-hall-asbestos-abatement-2/
LOCATION:AL
CATEGORIES:Pre-Bid Conference
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180918T140000
DTEND;TZID=America/Chicago:20180918T150000
DTSTAMP:20260406T095101
CREATED:20181008T204511Z
LAST-MODIFIED:20181015T160022Z
UID:888-1537279200-1537282800@constructionpublicinfo.ua.edu
SUMMARY:Bryant Conf. Center\, Seller Auditorium Lighting Upgrade
DESCRIPTION:301-18-1651
URL:https://constructionpublicinfo.ua.edu/bid/bryant-conf-center-seller-auditorium-lighting-upgrade-2/
LOCATION:AL
CATEGORIES:Pre-Bid Conference
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180920T100000
DTEND;TZID=America/Chicago:20180920T110000
DTSTAMP:20260406T095101
CREATED:20181008T204510Z
LAST-MODIFIED:20181015T160022Z
UID:887-1537437600-1537441200@constructionpublicinfo.ua.edu
SUMMARY:University Services Campus Warehouse Conversion Phase II
DESCRIPTION:1006-17-1334
URL:https://constructionpublicinfo.ua.edu/bid/university-services-campus-warehouse-conversion-phase-ii-2/
LOCATION:AL
CATEGORIES:Pre-Bid Conference
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180925T090000
DTEND;TZID=America/Chicago:20180926T050000
DTSTAMP:20260406T095101
CREATED:20181008T201512Z
LAST-MODIFIED:20181008T201512Z
UID:745-1537866000-1537938000@constructionpublicinfo.ua.edu
SUMMARY:Electrical Shutdown - Bryant Denny Stadium \, UA Electrical Maintenance
DESCRIPTION:An electrical shutdown has been scheduled for BDS in order for UA Electrical to install additional meters for gameday monitoring.This shutdown is scheduled for tomorrow\, Wednesday\, September 26th\, 2018 from 5:00 AM to 9:00 AM.\nThis will NOT impact power to the Digital Media Center and the North Zone.\nNotes:\n• This will impact all electrical and mechanical systems\n• BDS is on 7 back-up emergency generators\n• The Emergency Operations Center will be impacted (EOC is on the back-up emergency system)\n• Fire Alarm system is on back-up emergency system\n• BDS has (2) fire pumps\n• Chillers for the south zone\, and east and west sides will be impacted\n• West elevators will be out of operation. North\, south and east elevators are on the back-up emergency system\n• Camera systems/monitoring equipment will be ok per Michael Kelley (note from prior shutdown)\n• Access control will not be operational.  Not on emergency system\n• The gate control for Zoe’s on south end will be impacted\n• The OIT data closet by the home team locker room is not on the emergency system. No other buildings should be impacted (note from prior shutdown)\nAction Items:\n• 2 fire pumps impacted – South and East Sides – East side fire pump is on back-up emergency system.  UA Plumbing to verify if the south side fire pump is on the emergency system\n• UA Plumbing shop to verify if plumbing equipment (booster pumps\, sump and grinder pumps\, water heaters\, ect.) are on the emergency system.  If not\, is generator needed? (ask Terry McMillan with UA Electrical)\n• UA HVAC to shutdown all mechanical equipment and start-up once power is restored\n• UA Elevator Maint. to shutoff and secure all elevators that will not remain operational.  Verify start-up once power is restored\n• UA Electrical to notify Stephen Lake 30 min prior to restoring normal power in order to test transfer switch functionality for east elevators\n• Shawn Templeton to coordinate with Zoe’s Kitchen\n• Due to security risk\, building signage will not be posted\n• Ricky Luker to submit work orders to shops for building support upon request
URL:https://constructionpublicinfo.ua.edu/bid/electrical-shutdown-bryant-denny-stadium-ua-electrical-maintenance/
LOCATION:AL
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180925T170000
DTEND;TZID=America/Chicago:20180925T170000
DTSTAMP:20260406T095101
CREATED:20181008T204122Z
LAST-MODIFIED:20181008T204122Z
UID:832-1537894800-1537894800@constructionpublicinfo.ua.edu
SUMMARY:Capital Hall 2nd Floor Renovation for Title IX
DESCRIPTION:419-18-1684
URL:https://constructionpublicinfo.ua.edu/bid/capital-hall-2nd-floor-renovation-for-title-ix/
LOCATION:AL
CATEGORIES:Prequalifications
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180925T170000
DTEND;TZID=America/Chicago:20180925T170000
DTSTAMP:20260406T095101
CREATED:20181008T204126Z
LAST-MODIFIED:20181008T204126Z
UID:833-1537894800-1537894800@constructionpublicinfo.ua.edu
SUMMARY:Lakeside Dining Dishroom Renovations
DESCRIPTION:267-18-1720
URL:https://constructionpublicinfo.ua.edu/bid/lakeside-dining-dishroom-renovations/
LOCATION:AL
CATEGORIES:Prequalifications
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20180926T220000
DTEND;TZID=America/Chicago:20180927T020000
DTSTAMP:20260406T095101
CREATED:20181008T201511Z
LAST-MODIFIED:20181015T201800Z
UID:744-1537999200-1538013600@constructionpublicinfo.ua.edu
SUMMARY:Water Outage - Mal Moore Athletic Facility \, UA Plumbing Maintenance
DESCRIPTION:The UA Plumbing Dept. will be shutting off water (domestic only) to the Mal Moore Athletic Facility in order to repair a leak.This outage is scheduled to start tonight\, Wednesday\, September 26th\, 2018 at 10:00 PM and last until 2:00 AM.\nThis will not impact the fire sprinkler water. \n			\n				\n					\n						\n							\n							Loading...\n						\n					\n					\n						\n							\n							Taking too long?\n						\n						\n							\n								 Reload document							\n							|\n							\n								 Open in new tab							\n					 \n				\n			\n		Download [115.14 KB]
URL:https://constructionpublicinfo.ua.edu/bid/water-outage-mal-moore-athletic-facility-ua-plumbing-maintenance/
LOCATION:AL
END:VEVENT
END:VCALENDAR