Loading Events

« All Events

  • This event has passed.

PreQual: McMillan Building 1st Floor Renovation Phase II #401-19-1751

02/12/2019 @ 5:00 PM - 02/14/2019 @ 5:00 PM CST

Request & Submit Pre-Qual Packets from:

Brian Morris – PM

UA – Construction Admin.

1205 14th Street

Tuscaloosa, Al 35401

205-348-8687

bmorris@fa.ua.edu

AND Submit also to the following person below:

Phillip Black

B-Group Architecture

104 23rd Street South, Suite 200

Birmingham, Alabama 35233

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download [109.21 KB]

Details

Start:
02/12/2019 @ 5:00 PM CST
End:
02/14/2019 @ 5:00 PM CST
Event Category:

Organizer