Parking Lot Closure – Smith/Jones Lot

During this time, access to the parking lot via Margaret Drive will not be allowed.  Access to the east half of the parking lot will be allowed via Hackberry beginning February 5.The parking lot will be closed on February 5 in order to relocate the fence and the pipe.

Lane Closure – East Bound Lane of Margaret Drive

A portion of the east bound lane of Margaret Dr. will be closed between the hours of 8:00 AM and 5:00 PM from Monday (2/19/18) through Wednesday (2/21/18). A flagman will be present during the hours of the closure to help with traffic flow.  This should not impact the exit drive from the Fresh Foods […]

Electrical Shutdown – Blount Living Learning Center

Notes:• Building has back-up emergency generator and will remain operational • Fire alarm system is on back-up emergency power system and will remain operational • Fire pump is on back-up emergency power system and will remain operational • UA HVAC to shutoff chiller and equipment • UA Elev. to shutoff and secure elevator(s)

Electrical Shutdown – Friedman Hall

Notes:• Building does not have back-up emergency generator • Fire alarm system is on battery back-up and will remain operational • Building does not have a fire sprinkler system • UA HVAC to shutoff chiller and equipment • UA Elev. to shutoff and secure elevator(s)

Electrical Shutdown – Lakeside East & West Residential

Notes:• This will also impact the backup emergency power system • Fire alarm system is on battery back-up and will remain operational • Fire pump for both buildings will not be operational due to emergency power system impacted o Temp. generator needed for fire pump or a fire watch performed if building is to be occupied • UA HVAC to […]