Thermal Hot Water Outage – Smith Hall

Notes:Hot Water • Building should only see minimal impact due to HW outage • This will only impact the reheating system of the building • If outside temps were to drop low enough, […]

Thermal Cold Water Outage – Smith Hall

Notes:Chilled Water • This will impact A/C for the entire building during the week of spring break • Building impact would depend on outside temps during spring break • UA OIT to verify […]

Thermal “Chilled WAter” Outage – Biology Building

Notes:• Entire building will be without A/C • Building heat will not be impacted • UA HVAC to setup temporary “water cooled” A/C units in rooms 211-213 (computers/office), 228, 245-246 (fish spaces) • UA […]

Thermal “Chilled Water” Outage – Little Hall

Notes:• Entire building will be without A/C • Building heat will not be impacted • UA OIT to verify if temp. A/C is needed for data closets.  UA HVAC to verify if data […]

Electrical Shutdown – AIME Building

Notes:• Building has back-up emergency generator • Fire alarm system is on the emergency power system and will remain operational • Fire sprinkler system is operated by city water pressure and will remain […]

Electrical Shutdown – Moody Music Building

This will impact all mechanical and electrical systems of the building.  Notes: • Building has a back-up emergency generator • Fire alarm system is on the emergency generator and will remain operational […]

Water Outage – New Alpha Omicron Pi Chapter House

Planning is complete for a short, 30 minute water outage that should only impact Reese-Phifer Hall and the annex building.  This outage is scheduled for Wednesday, April 11th, 2018 from […]

Water Outage – HR Latham Building Renovation

Planning is complete for a short, 30 minute water outage that will impact both domestic and fire water to all buildings north of Ruby Tyler Pkwy on the University Services […]

Electrical Shutdown – University Services Campus

Planning is complete for an upcoming electrical shutdown of the University Services Campus. • Impacted buildings include: o All buildings north of Ruby Tyler Pkwy o F.C. White Food Service building and Wallace […]

Water Outage – New Alpha Omicron Pi Chapter House

Planning is complete for another water outage that will impact Reese-Phifer Hall and the Reese-Phifer Annex buildings in order to relocate an existing water line for the subject project.  This […]

Water Outage – Capstone Parking Deck

Planning is complete for an upcoming water outage in order to lower an existing 30” city main so that future storm drainage can be installed for the subject project.  This […]