Peter Bryce Main Building Stabilization
415-14-172
415-14-172
Planning is complete for an upcoming electrical shutdown of Tutwiler Dorm, including the energy plant and the 2-level wing connected to Tutwiler in order to perform preventive maintenance.This shutdown is scheduled for Friday, June 29th, 2018 from 5:0O AM to 9:00 AM. This will impact all electrical and mechanical systems. Notes: • Tutwiler is on back-up […]
There will be a scheduled power outage on the Stadium Drive Deck (South Ten Hoor Deck) in order for UA Electrical to perform some PM work.This outage is scheduled for July 3, 2018, from 6:00 AM until 2:00 PM.
A complete domestic water outage at Presidential Village II in order for UA Plumbing to make some repairs.This is scheduled for Thursday, July 5th, 2018 from 7:30 AM to 4:00 PM.
Planning is complete for a water outage on the USC (Partlow Campus) in order to perform some necessary maintenance on the water line.This outage is scheduled for July 7th, from 6:00 am until 11:00 am. Buildings impacted include: Business Activities Procurement HR Latham
Planning is complete for an upcoming electrical shutdown of Riverside East and North Residential in order to perform preventive maintenance.This shutdown is scheduled for Monday, July 9th, 2018 from 9:0O AM to 2:00 PM. This will impact all electrical and mechanical systems. Notes: • Riverside E and N does not have back-up emergency generator • Fire alarm […]
904-18-1364
Planning is complete for an upcoming electrical shutdown of Garland Hall in order to tie-in an exterior lighting circuit for the subject project.This shutdown is scheduled for Thursday, July 12th, 2018 from 5:00 AM to 7:00 AM. Notes: • Garland Hall does not have an emergency generator • Fire alarm system is on battery backup and will […]
Planning is complete for an upcoming fire sprinkler outage at the Mal Moore Athletic Facility.This outage is scheduled for Thursday, July 12th, 2018 from 7:00 AM to 8:00 AM. This will not be an entire building outage. Plumbing Shop and EHS are aware. Notes: • UA Plumbing shop will valve off the system and refill once […]
Planning is complete for an upcoming electrical shutdown in order to remove the temporary construction power for the New Freshman Res. Hall project.This shutdown is scheduled for July 13th, 2018 from 8:00 AM to 11:00 AM. Notes: • This will essentially have no impact on any adjacent buildings • This will require the transformer serving the emergency […]
The work for this outage was performed Thursday, July 13th, 2018 due to the existing water line rupturing, forcing an emergency outage. Buildings impacted include: Business Activities Procurement Ruby Tyler Cottages 5, 8 and 9
UA Plumbing will need to shutdown the steam system feeding Coleman Coliseum, the Indoor Practice Facility, the and Strength and Conditioning Facility in order to make repairs to the steam line.This shutdown is scheduled to start Monday night, July 16th, 2018 and last until sometime on Wednesday, July 18th, 2018. This will only impact the […]
Planning is complete for an upcoming electrical shutdown of Friedman Hall and Maxwell Hall in order for UA Electrical to perform preventive maintenance.This shutdown is scheduled for Tuesday, July 17th, 2018 from 5:00 AM to 12:30 PM. **Graves Hall could possibly be shutdown for 30 minutes at the beginning and ending of the above timeframe. […]
Planning is complete for an upcoming fire sprinkler outage at Capital Hall in order to relocate a couple of existing sprinkler heads.This outage is scheduled for Thursday, July 19th, 2018 from 8:00 AM to 5:00 PM. Notes: • Global Fire will perform shutoff and drain the system. UA Plumbing is ok with this since Global is […]
1024-18-1349
Alabama Power Co. will need to shutoff power to 401 Queen City Ave. in order to fix an issue caused by a recent storm event.This shutdown is scheduled for Tuesday, July 24th, 2018 starting at 7:30 AM and could last approx. 2 hours. Notes: • Building rep is aware and will coordinate shutdown with building occupants […]
904-18-1364
Planning is complete for an upcoming electrical shutdown of Tutwiler Hall.This shutdown is scheduled for Tuesday, July 24th, 2018 from 4:00 PM to 6:00 PM. Notes: • Building has a back-up emergency generator • Fire Alarm system will remain operational • Building does not have camps this day and should only be occupied by a few staff • UA […]
219-18-1324
The UA Plumbing Dept. will be shutting off gas to Tutwiler Hall and the Transit Maint. Facility (University Services Campus) for maintenance reasons.This outage is scheduled for Wednesday, July 25th, 2018 from 11:00 PM to 7:00 AM. This will impact the domestic hot water for both buildings. According to UA HVAC, this should only impact […]
Planning is complete for an upcoming electrical shutdown of the University Services Campus.• Impacted buildings include: o All buildings north of Ruby Tyler Pkwy o F.C. White Food Service building and Wallace Educational building which are on the south side of Ruby Tyler Pkwy o The New Kitchen for Bryce and the Main Bryce Hospital will not be impacted […]
219-18-1324
327-18-1566
A short, 30 minute gas outage has been planned for Shelby Hall and Graves Hall in order to perform maintenance to the gas meter.This work is scheduled for some time between 11:00 PM on Wednesday, August 8th, 2018 and 7:00 AM on Thursday, August 9th, 2018. Due to the short duration, the buildings shouldn’t see […]
Planning is complete for an upcoming electrical shutdown of Lakeside Dining in order to test the emergency generator.This shutdown is scheduled for Friday, August 10th, 2018 from 9:00 AM to 10:00 AM. Due to notice of shutdown, this was coordinated by phone with all parties. Notes: • UA Electrical to shutoff normal power to simulate a […]
Planning is complete for an upcoming electrical shutdown of Hardaway Hall in order for UA Electrical to take measurements of the main switch gear for a future upgrade.This shutdown is scheduled for Saturday, August 11th, 2018 from 6:00 AM to 2:30 PM. Due to notice of shutdown, this was coordinated by phone with all parties. […]
TRN-18-1714
327-18-1566
UA Electrical will need to shutoff power to 401 Queen City Ave. in order to replace electrical equipment. This shutdown is scheduled for Monday, August 21st, 2018 from 5:00 PM to 7:00 PM. Notes: • Building rep is aware and will coordinate shutdown with building occupants • Please shutdown all computers and electronic equipment prior to […]
219-18-1324
303-18-1446
TRN-18-1714
327-18-1566
Planning is complete for an upcoming electrical shutdown of Morgan Hall in order for UA Electrical to perform preventive maintenance.This shutdown is scheduled for Sunday, September 2nd, 2018 from 6:30 AM to 7:30 AM. Notes: • Building does not have a back-up emergency generator • Fire alarm system is on battery back-up and will remain operational • Building rep […]
903-18-1673
Planning is complete for an electrical shutdown at Bidgood Hall to test emergency lighting for the new Behavioral Lab 249.The shutdown is scheduled for Wednesday September 5th from 5:00 – 5:30 am. Notes: • The electrical shop did verify that the emergency generator is in service and functioning properly. • The outage will effect Bidgood Hall and […]
303-18-1446
1017-17-1073