Electrical Shutdown – University Hall, UA# 420-17-1006

This shutdown has been rescheduled for Thursday, June 14th, 2018 from 1:00 PM to 5:00 PM.This will shutoff power to Bryant-Jordan Hall, Bryce Superintendents Building and will impact construction power to the main Bryce Hospital. Notes: • Fire Alarm system for Bryant-Jordan Hall is on battery back-up and will remain operational • UA Facilities to perform walk-thru […]

Electrical Shutdown – University Hall Renovation , UA# 420-17-1006

Planning is complete for an upcoming electrical shutdown for the University Hall Renovation project.This shutdown is scheduled for Saturday, July 21st, 2018 from 7:00 AM to 12:00 PM. This will impact normal power to Capital Hall, Bryant-Jordan Hall, the Bryce Main and old Superintendents building. Notes: • UA Electrical to coordinate “hot ties” with Alabama Power.  […]

Electrical Shutdown – Ridgecrest South Outside Air System Replacement , UA# 271-17-1392

Planning is complete for an upcoming electrical shutdown of Ridgecrest South in order to tie-in power to the new outside air units.This shutdown is scheduled for Wednesday, June 27th, 2018 from 9:00 AM to 2:00 PM. This will impact all electrical and mechanical systems. Notes: • Building is on back-up emergency generator • Fire alarm system will […]

Electrical Shutdown – Tutwiler Hall , UA Electrical Maintenance

Planning is complete for an upcoming electrical shutdown of Tutwiler Dorm, including the energy plant and the 2-level wing connected to Tutwiler in order to perform preventive maintenance.This shutdown is scheduled for Friday, June 29th, 2018 from 5:0O AM to 9:00 AM. This will impact all electrical and mechanical systems. Notes: • Tutwiler is on back-up […]

Electrical Shutdown – Stadium Drive Deck

There will be a scheduled power outage on the Stadium Drive Deck (South Ten Hoor Deck) in order for UA Electrical to perform some PM work.This outage is scheduled for July 3, 2018, from 6:00 AM until 2:00 PM.

Water Outage – University Aervices Campus

Planning is complete for a water outage on the USC (Partlow Campus) in order to perform some necessary maintenance on the water line.This outage is scheduled for July 7th,  from 6:00 am until 11:00 am. Buildings impacted include:                 Business Activities                 Procurement                 HR                 Latham

Electrical Shutdown – Riverside East and North Residential , UA Electrical Maintenance

Planning is complete for an upcoming electrical shutdown of Riverside East and North Residential in order to perform preventive maintenance.This shutdown is scheduled for Monday, July 9th, 2018 from 9:0O AM to 2:00 PM. This will impact all electrical and mechanical systems. Notes: • Riverside E and N does not have back-up emergency generator • Fire alarm […]

Electrical Shutdown – New Freshman Residence Hall , UA# 272-16-952

Planning is complete for an upcoming electrical shutdown in order to remove the temporary construction power for the New Freshman Res. Hall project.This shutdown is scheduled for July 13th, 2018 from 8:00 AM to 11:00 AM. Notes: • This will essentially have no impact on any adjacent buildings • This will require the transformer serving the emergency […]

Water Outage – University Services Campus Water Lines , UA# UTL-18-1449

The work for this outage was performed Thursday, July 13th, 2018 due to the existing water line rupturing, forcing an emergency outage.   Buildings impacted include:                 Business Activities                 Procurement                 Ruby Tyler                 Cottages 5, 8 and 9

Steam Outage – Athletic Energy Plant , UA Plumbing Maintenance

UA Plumbing will need to shutdown the steam system feeding Coleman Coliseum, the Indoor Practice Facility, the and Strength and Conditioning Facility in order to make repairs to the steam line.This shutdown is scheduled to start Monday night, July 16th, 2018 and last until sometime on Wednesday, July 18th, 2018. This will only impact the […]

Electrical Shutdown – Tutwiler Hall , UA Building Maintenance

Planning is complete for an upcoming electrical shutdown of Tutwiler Hall.This shutdown is scheduled for Tuesday, July 24th, 2018 from 4:00 PM to 6:00 PM. Notes: • Building has a back-up emergency generator • Fire Alarm system will remain operational • Building does not have camps this day and should only be occupied by a few staff • UA […]

Gas Outage – Tutwiler Hall and Transit Maint. Facility , UA Plumbing Maintenance

The UA Plumbing Dept. will be shutting off gas to Tutwiler Hall and the Transit Maint. Facility (University Services Campus) for maintenance reasons.This outage is scheduled for Wednesday, July 25th, 2018 from 11:00 PM to 7:00 AM. This will impact the domestic hot water for both buildings. According to UA HVAC, this should only impact […]

Electrical Shutdown – University Services Campus Medium Voltage Upgrades , UA# 000-15-377

Planning is complete for an upcoming electrical shutdown of the University Services Campus.• Impacted buildings include: o All buildings north of Ruby Tyler Pkwy o F.C. White Food Service building and Wallace Educational building which are on the south side of Ruby Tyler Pkwy o The New Kitchen for Bryce and the Main Bryce Hospital will not be impacted […]

Gas Outage – Shelby Hall and Graves Hall , UA Plumbing Maintenance

A short, 30 minute gas outage has been planned for Shelby Hall and Graves Hall in order to perform maintenance to the gas meter.This work is scheduled for some time between 11:00 PM on Wednesday, August 8th, 2018 and 7:00 AM on Thursday, August 9th, 2018. Due to the short duration, the buildings shouldn’t see […]

Electrical Shutdown – Lakeside Dining Renovation , UA# 267-15-660

Planning is complete for an upcoming electrical shutdown of Lakeside Dining in order to test the emergency generator.This shutdown is scheduled for Friday, August 10th, 2018 from 9:00 AM to 10:00 AM. Due to notice of shutdown, this was coordinated by phone with all parties. Notes: • UA Electrical to shutoff normal power to simulate a […]

Electrical Shutdown – Hardaway Hall , UA Electrical Maintenance

Planning is complete for an upcoming electrical shutdown of Hardaway Hall in order for UA Electrical to take measurements of the main switch gear for a future upgrade.This shutdown is scheduled for Saturday, August 11th, 2018 from 6:00 AM to 2:30 PM. Due to notice of shutdown, this was coordinated by phone with all parties. […]