Electrical Shutdown – Stadium Drive Deck

  • October 8th, 2018
  • in

There will be a scheduled power outage on the Stadium Drive Deck (South Ten Hoor Deck) in order for UA Electrical to perform some PM work.This outage is scheduled for July 3, 2018, from 6:00 AM until 2:00 PM.

Electrical Shutdown – Riverside East and North Residential , UA Electrical Maintenance

  • October 8th, 2018
  • in

Planning is complete for an upcoming electrical shutdown of Riverside East and North Residential in order to perform preventive maintenance.This shutdown is scheduled for Monday, July 9th, 2018 from 9:0O AM to 2:00 PM.
This will impact all electrical and mechanical systems.
Notes:
• Riverside E and N does not have back-up emergency generator
• Fire alarm system is on battery backup and will remain operational
• Fire sprinkler system for both buildings is operated from the Presidential Village 1 fire pump and will remain operational
• UA HVAC to shutoff all mechanical equipment and verify startup
• UA Elevator to shutdown and secure the elevators
• There are no summer camps in Riverside E & N on this day
• Ricky Luker to submit work orders to shops
Please direct any questions regarding this shutdown to Ricky Luker. (205) 361-1664

Water Outage – University Aervices Campus

  • October 8th, 2018
  • in

Planning is complete for a water outage on the USC (Partlow Campus) in order to perform some necessary maintenance on the water line.This outage is scheduled for July 7th,  from 6:00 am until 11:00 am.
Buildings impacted include:
                Business Activities
                Procurement
                HR
                Latham

Electrical Shutdown – Garland Hall , UA Building Maintenance Clark Hall Exterior Enhancements

  • October 8th, 2018
  • in

Planning is complete for an upcoming electrical shutdown of Garland Hall in order to tie-in an exterior lighting circuit for the subject project.This shutdown is scheduled for Thursday, July 12th, 2018 from 5:00 AM to 7:00 AM.
Notes:
• Garland Hall does not have an emergency generator
• Fire alarm system is on battery backup and will remain operational
• All computers within the building will need to shutoff prior to the shutdown
• UA Electrical to submit work orders to UA HVAC, UA Plumbing and UA Elevator for building support.

Water Outage – University Services Campus Water Lines , UA# UTL-18-1449

  • October 8th, 2018
  • in

The work for this outage was performed Thursday, July 13th, 2018 due to the existing water line rupturing, forcing an emergency outage.  
Buildings impacted include:
                Business Activities
                Procurement
                Ruby Tyler
                Cottages 5, 8 and 9

Fire Sprinkler Outage – Mal Moore Athletic Facility Recruiting Room Upgrades , UA# 085-18-1485

  • October 8th, 2018
  • in

Planning is complete for an upcoming fire sprinkler outage at the Mal Moore Athletic Facility.This outage is scheduled for Thursday, July 12th, 2018 from 7:00 AM to 8:00 AM.
This will not be an entire building outage.
Plumbing Shop and EHS are aware.
Notes:
• UA Plumbing shop will valve off the system and refill once work is complete
• Contractor to drain the system and make the tie-in
• EHS to bypass the flow switches prior to refilling the system
• Fire watch not required due to duration being less than 4 hours
• Alison Ferrer to submit work orders to UA Plumbing and UA EHS

Electrical Shutdown – New Freshman Residence Hall , UA# 272-16-952

  • October 8th, 2018
  • in

Planning is complete for an upcoming electrical shutdown in order to remove the temporary construction power for the New Freshman Res. Hall project.This shutdown is scheduled for July 13th, 2018 from 8:00 AM to 11:00 AM.
Notes:
• This will essentially have no impact on any adjacent buildings
• This will require the transformer serving the emergency power system of Ridgecrest E & W to be de-energized, thus, causing the emergency generator to respond.  Once emergency generator responds within seconds, Ridgecrest E & W will function as normal again
• The fire pump will remain operational once the generator responds
• UA Electrical to perform power shutdown
• UA HVAC to verify if A/C units for data closet are on e-power and verify if operational

Steam Outage – Athletic Energy Plant , UA Plumbing Maintenance

  • October 8th, 2018
  • in

UA Plumbing will need to shutdown the steam system feeding Coleman Coliseum, the Indoor Practice Facility, the and Strength and Conditioning Facility in order to make repairs to the steam line.This shutdown is scheduled to start Monday night, July 16th, 2018 and last until sometime on Wednesday, July 18th, 2018.
This will only impact the reheating for the buildings listed above.
Athletics is aware that these buildings could possibly see slightly lower temps than normal.
UA HVAC will make adjustments to regulate temps.

Electrical Shutdown – Friedman Hall, Maxwell Hall and Graves Hall , UA Electrical Maintenance

  • October 8th, 2018
  • in

Planning is complete for an upcoming electrical shutdown of Friedman Hall and Maxwell Hall in order for UA Electrical to perform preventive maintenance.This shutdown is scheduled for Tuesday, July 17th, 2018 from 5:00 AM to 12:30 PM.
**Graves Hall could possibly be shutdown for 30 minutes at the beginning and ending of the above timeframe.
Notes:
• Friedman Hall and Maxwell Hall do not have a back-up emergency generator
• Fire alarm systems for all buildings are on battery back-up and will remain operational
• No other building concerns
• No concerns at Graves Hall due to short duration of outages