Electrical Shutdown – Bicycle Shop Operation Center Demolition , UA# 424-17-1246

  • October 8th, 2018
  • in

Planning is complete for an upcoming electrical shutdown in order to remove power to the Bicycle Shop Operation Center to allow for demolition.This shutdown is scheduled for Wednesday, June 6th, 2018 from 5:00 AM to 8:00 AM, but could end sooner.
This will impact power to EHS, Student Media and the Theater and Dance buildings.
Notes:
• UA Electrical is aware and will perform the disconnection
• Student Media is on back-up emergency generator and all equipment will stay operational
• Student Media fire alarm system is on the emergency generator and will remain operational
• EHS & Theater and Dance do not have a back-up emergency generator but fire alarm systems are on battery back-up and will remain operational
• UA HVAC to verify all A/C equipment is operational once power is restored to EHS, Student Media, & Theater and Dance

Gas Outage – Capstone Parking Deck, UA# 680-15-363

  • October 8th, 2018
  • in

Planning is complete for an upcoming gas outage in order to relocate an existing gas line that is in conflict the installation of a storm drain for the captioned project.This outage is scheduled for Thursday, June 14th, 2018 from 7:00 AM to 5:00 PM.
This will impact gas service to Moody Music Building, Bryant Conference Center and Bryant Museum.
Notes:
• This will impact the domestic (hot) water
• This will impact building reheat for all 3 buildings. Slightly lower building temps should be expected
• UA Plumbing to shutoff/turn on gas at closest valve
• UA Plumbing and UA HVAC will restart all gas equipment once work is complete

Electrical Shutdown – University Hall Renovation , UA# 420-17-1006

  • October 8th, 2018
  • in

Planning is complete for an upcoming electrical shutdown for the University Hall Renovation project.This shutdown is scheduled for Saturday, July 21st, 2018 from 7:00 AM to 12:00 PM.
This will impact normal power to Capital Hall, Bryant-Jordan Hall, the Bryce Main and old Superintendents building.
Notes:
• UA Electrical to coordinate “hot ties” with Alabama Power.  This allows for isolation of only the buildings noted above.  The Harper Center on Bryce campus will not be impacted
• Capital Hall
o Has back-up emergency generator
o Fire alarm system is on emergency generator and will remain operational
o Fire pump is on emergency generator so the fire sprinkler system will remain operational
o UA HVAC to shutoff and restart equipment
o UA Plumbing – No items of concern noted
o UA Elevator to shutdown and secure the elevators
o Access control (card access) on west side of building will not be operational
o All computers need to be powered down prior to electrical shutdown
• Bryant-Jordan Hall
o Fire Alarm system is on battery back-up and will remain operational
o UA HVAC to shutoff and restart equipment
o UA Plumbing – No items of concern noted
o All computers need to be powered down prior to electrical shutdown
• UA Facilities to perform walk-thru of both buildings once power is restored

Electrical Shutdown – University Hall, UA# 420-17-1006

  • October 8th, 2018
  • in

This shutdown has been rescheduled for Thursday, June 14th, 2018 from 1:00 PM to 5:00 PM.This will shutoff power to Bryant-Jordan Hall, Bryce Superintendents Building and will impact construction power to the main Bryce Hospital.
Notes:
• Fire Alarm system for Bryant-Jordan Hall is on battery back-up and will remain operational
• UA Facilities to perform walk-thru of Bryant-Jordan Hall once power is restored.
• No other concerns to other buildings noted.

Fire Sprinkler Outage Coordination – Mal Moore Athletic Facility Recruiting Room Upgrades, UA# 085-18-1485

  • October 8th, 2018
  • in

Planning is complete for an upcoming fire sprinkler outage at the Mal Moore Athletic Facility in order to relocate existing fire sprinkler heads on the 1st floor, north end. This outage is scheduled for Friday, June 22nd, 2018 from 5:00 AM to 7:00 AM.
This will not be an entire building outage.  It should only impact a portion of the building on the 1st floor, north end.
Notes:
• UA Plumbing shop will valve off the system and refill once work is complete
• Contractor to drain the system and make the tie-in
• EHS to bypass the flow switches prior to refilling the system
• Fire watch not required due to duration being less than 4 hours

Electrical Shutdown – Ridgecrest South Outside Air System Replacement , UA# 271-17-1392

  • October 8th, 2018
  • in

Planning is complete for an upcoming electrical shutdown of Ridgecrest South in order to tie-in power to the new outside air units.This shutdown is scheduled for Wednesday, June 27th, 2018 from 9:00 AM to 2:00 PM.
This will impact all electrical and mechanical systems.
Notes:
• Building is on back-up emergency generator
• Fire alarm system will remain operational
• Fire pump is on the emergency power system and will remain operational
• Mike Largin to contact Ray Bostick and Randy Mathis to discuss details about the data equipment area.  It was mentioned in the meeting that all data equipment and A/C for this area is on the emergency power system and will remain operational
• UA HVAC to shutoff all equipment and verify startup once power is restored
• UA Plumbing to verify impact on all plumbing equipment and verify startup once power is restored
• UA Elevator to shutdown and secure all elevators
• Parking deck roll up doors will not be operational.  They will need to remain in the open position
• The faculty apartment is currently the only room occupied

Electrical Shutdown – Tutwiler Hall , UA Electrical Maintenance

  • October 8th, 2018
  • in

Planning is complete for an upcoming electrical shutdown of Tutwiler Dorm, including the energy plant and the 2-level wing connected to Tutwiler in order to perform preventive maintenance.This shutdown is scheduled for Friday, June 29th, 2018 from 5:0O AM to 9:00 AM.
This will impact all electrical and mechanical systems.
Notes:
• Tutwiler is on back-up emergency generator
• Fire alarm system is on the generator and will remain operational
• Fire pump will remain operational
• UA HVAC to shutoff all mechanical equipment and verify startup
• UA Plumbing to verify startup of booster pumps and sump pump in energy plant
• UA Elevator to shutdown and secure the elevators
• Ricky Luker to submit work orders to shops
Please direct any questions regarding this shutdown to Ricky Luker. (205) 361-1664

Electrical Shutdown – Stadium Drive Deck

  • October 8th, 2018
  • in

There will be a scheduled power outage on the Stadium Drive Deck (South Ten Hoor Deck) in order for UA Electrical to perform some PM work.This outage is scheduled for July 3, 2018, from 6:00 AM until 2:00 PM.

Electrical Shutdown – Riverside East and North Residential , UA Electrical Maintenance

  • October 8th, 2018
  • in

Planning is complete for an upcoming electrical shutdown of Riverside East and North Residential in order to perform preventive maintenance.This shutdown is scheduled for Monday, July 9th, 2018 from 9:0O AM to 2:00 PM.
This will impact all electrical and mechanical systems.
Notes:
• Riverside E and N does not have back-up emergency generator
• Fire alarm system is on battery backup and will remain operational
• Fire sprinkler system for both buildings is operated from the Presidential Village 1 fire pump and will remain operational
• UA HVAC to shutoff all mechanical equipment and verify startup
• UA Elevator to shutdown and secure the elevators
• There are no summer camps in Riverside E & N on this day
• Ricky Luker to submit work orders to shops
Please direct any questions regarding this shutdown to Ricky Luker. (205) 361-1664